Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Protect Your Crew. Exceed Weld Standards.
  • Black pipes land in Europe as UK backs ship carbon capture trial
  • US Unveils Schedule for Over 30 Offshore Lease Auctions
  • Fincantieri Sues Owens Corning For $100 Million Over Defective Fire Panels On Ships
  • Boskalis kicks off boulder clearance work offshore Poland
  • Eastern Shipbuilding wins WSF bid for two hybrid-electric ferries
  • BP confirms multimillion-dollar deals for gas field expansion and terminal electrification
  • Blueye Robotics to Deliver ROVs to the Netherlands Royal Navy
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Oil & Gas»2012-built rig at designated spot: Petrobras sets the stage to secure go-ahead for drilling ops
Oil & Gas

2012-built rig at designated spot: Petrobras sets the stage to secure go-ahead for drilling ops

August 19, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Petrobras Prepares for Pre-Operational Assessment in Amapá

Following the arrival of a drillship at its drill site, Brazil’s state-owned oil and gas giant Petrobras is getting ready to embark on the pre-operational assessment, as the final stage of the licensing process for drilling a deepwater well in Amapá.

As one of the resources that will be put into practice during the pre-operational assessment, which is scheduled to begin on August 24, the Foresea ODN II (NS-42) drillship, chartered by Petrobras, arrived at the location in block FZA-M-59, located in the deep waters of Amapá, on the evening of Monday, August 18.

This is the final stage of the environmental licensing process for drilling a well in offshore block FZA-M-59, situated 175 kilometers off the coast of Amapá and more than 500 kilometers from the mouth of the Amazon River. The exercise, which will involve over 400 people, will rely on logistical resources such as large vessels, helicopters, and the NS-42 rig positioned at the well site.

During the planned activity, Ibama will evaluate Petrobras’ compliance with the actions outlined in the wildlife protection and response plans and the emergency plan through a simulated accident response, reviewing aspects such as equipment efficiency, agility, compliance with scheduled wildlife response times, and communication with authorities and stakeholders.

As a result, Petrobras, which will be able to demonstrate its ability to act promptly, will be eligible to receive a drilling license for the well. This procedure is similar to the one carried out in 2023 in the offshore Rio Grande do Norte region, before the granting of drilling licenses for the Pitu Oeste and Anhangá wells.

See also  ‘New benchmark’ for triad’s drilling JV with delivery of first wells under 20 days

The Brazilian giant claims that its operations in the Equatorial Margin, which encompasses the coastal strip between Amapá and Rio Grande do Norte, are conducted under strict social and environmental responsibility protocols.

Magda Chambriard, Petrobras’ CEO, stated:

“We will conduct this simulation with the rigorous safety and preparedness protocols we practice in all Petrobras activities. We are bringing to Amapá the largest incident response structure the company has ever mobilized.

“Confirmation of the existence of oil in the Equatorial Margin could open an important energy frontier for the country, which will develop in an integrated manner with other energy sources and will contribute to the fair, safe, and sustainable energy transition process.”

Petrobras has earmarked an investment of $3.1 billion for oil and gas exploration in the Brazilian Equatorial Margin basins within its Strategic Plan 2024-2028, which entails plans to drill 16 wells during the period. The firm intends to invest $7.5 billion in exploration by 2028 for 50 new exploratory wells.

2012built Designated Drilling goahead ops Petrobras rig Secure Sets spot Stage
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

BP confirms multimillion-dollar deals for gas field expansion and terminal electrification

August 20, 2025

MSC Sets a New Standard for Time Off in 2025, Plus Earn a $44,345 Bonus as an Able Seaman!

August 20, 2025

Interior rolls out long term offshore O&G lease sales schedule

August 19, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025
Don't Miss
Offshore

VARD cuts steel for second Island Offshore hybrid ocean energy construction vessel

July 5, 2025

Norwegian Shipbuilder VARD Begins Construction on Second Hybrid Power Ocean Energy Construction Vessel for Island…

Inmarsat To Upgrade Maritime Connectivity Services

February 6, 2025

Wagenborg, INEOS launch first offshore CO2 carrier built in Europe

May 15, 2025

Icon Offshore to become Lianson Fleet Group

January 28, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Israel & Hamas Agree To Ceasefire Deal That Could End Red Sea Shipping Crisis

January 17, 2025

Egypt Halts Fertilizer Production In Light Of Israeli

June 15, 2025

Yanmar wins DNV’s AiP for maritime hydrogen fuel cell system

April 11, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.