Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Hull for Japan-bound hybrid cable lay & construction vessel coming together in Romania (Video)
Offshore

Hull for Japan-bound hybrid cable lay & construction vessel coming together in Romania (Video)

March 12, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The Arrival of Aft Part for Customized Hybrid Power Cable Lay Vessel at VARD Shipyard

The aft part of the highly customized hybrid power cable lay and construction vessel that VARD is building for the Japanese offshore wind market has arrived at the company’s Tulcea shipyard where it will be joined with the forward parts of the hull.

The Norwegian ship designer and shipbuilder held the keel laying ceremony in September 2024 for the vessel it is building for Toyo Construction, a Japanese general construction company that operates civil and architecture construction businesses.

On February 28, the aft part of NB 980 was launched and delivered from VARD Shipyards Romania – Braila and towed to Tulcea where it arrived on March 2. Preparation is currently underway to join the aft part with the blocks built in Tulcea, planned by the end of March.

The vessel is scheduled to be launched in Tulcea during the summer and works will continue at the yard until finalization in Norway.

VARD said this was the first time it was building a vessel at two hull yards.

“I would like to express my sincere gratitude for the successful launch of the hull’s aft section at Braila. While our work here in Braila is concluding, operations will continue in Tulcea until the launch and transit to Norway,” said Toyo’s Project Manager Takashi Enomoto.

Toyo Construction and Mitsui O.S.K Lines (MOL) established a joint venture focusing on offshore wind power generation in the summer of 2023, through which they want to create stronger synergies in a wide range of areas related to offshore wind.

See also  Zamil Offshore’s New Fast Support Intervention Vessel Ready for Service

According to VARD, the vessel will have an optimal hull design to suit the natural and construction conditions in Japan, allowing it to be used in both shallow waters and deep waters for floating offshore wind power generation and DC power transmission projects.

Vard Electro is delivering SeaQ equipment and solutions, with Vard Interiors delivering modern interior solutions and green HVAC R system. Huisman will deliver a full electric 250mt hybrid boom subsea crane and a 100mt knuckle boom crane.

The self-propelled cable-laying vessel will be powered by five main gensets and two batteries and will have a carrying capacity of 9,000 tons. It will have a maximum transit speed of 13 knots and will comprise 90 single cabins for 90 persons on board.

The vessel is scheduled for completion by Q2 2026.

cable coming Construction hull hybrid Japanbound lay Romania Vessel Video
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Petrobras hands out $640M in ROV support vessel contracts to compatriot firm

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025
Don't Miss
Offshore

ExxonMobil Finds New Gas Deposit Off Cyprus

July 10, 2025

ExxonMobil and Qatar Energy Make Significant Gas Discovery off Cyprus ExxonMobil and Qatar Energy have…

Over 150 Volunteers Cleaning Black Sea Oil Spill Suffer Major Health Issues, 1 Dead

January 22, 2025

MWC Barcelona 2025: Huawei unveils global showcases alongside customers and launches 10 industry solutions with partners

March 4, 2025

Delays in plug & abandonment work may put $5.5 billion on UK decom tab

March 11, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Yinson Production buys out $409m FPSO loan from Brava Energia

August 10, 2025

US DOE clears path for approving LNG exports, deeming them in public interest

May 20, 2025

NextGeo wins $23m Prysmian deal

July 31, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.