Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • ILO to map gaps in Pakistan shipbreaking in the wake of HKC
  • Seventh FPSO prepares to join Petrobras’ Santos Basin field
  • One of UK’s Largest Cocaine Seizures Made at London Gateway Port
  • Danos Awarded Production Services Contract for Beacon Offshore Energy Deepwater Facility
  • Container Losses At Sea Rise In 2024 Due To Red Sea Disruptions
  • Nexans’ new cable layer traveling from Poland to Norway to finalize construction
  • NTSB Issues Preliminary Report on Mexican Navy Tall Ship Collision with Brooklyn Bridge
  • Second floating solar plant on the way for Norway’s northernmost fish farm
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Energy»With phase 1 fully booked, Northern Lights partners take €662M FID for project expansion
Energy

With phase 1 fully booked, Northern Lights partners take €662M FID for project expansion

March 30, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Northern Lights Joint Venture Expands CO2 Transport and Storage Capacity

The Northern Lights joint venture partners Equinor, Shell, and TotalEnergies have recently announced their final investment decision to move forward with phase two of the Northern Lights CO2 transport and storage development. This decision will significantly increase the project’s transport and storage capacity from 1.5 million to over 5 million tons of CO2 per year starting from 2028.

Phase One Success and Project Overview

The first phase of Northern Lights is part of the Longship full-scale carbon capture and storage (CCS) project initiated by the Norwegian government. It aims to demonstrate large-scale CO2 capture, transport, and storage, with Northern Lights focusing specifically on the transport and storage aspects.

CO2 captured and liquefied from customers’ sites is transported by ship to the onshore receiving terminal at Øygarden and then further transported via pipeline to a storage reservoir 2,600 meters under the North Sea seabed.

The official opening ceremony of the CO2 transport and storage facility in Øygarden took place on September 26, 2024, marking its readiness to receive and store CO2. The first phase is completed, fully booked, and set to start operations this summer with the first CO2 transportation from Heidelberg Materials’ cement factory in Brevik, Norway.

Phase Two Expansion and Funding

The second phase of the project, representing an investment of NOK 7.5 billion, has received approval for €131 million in funding from the Connecting Europe Facility (CEF) scheme. The expansion includes new onshore storage tanks, pumps, a jetty, injection wells, and transport vessels in Øygarden, with completion expected by the second half of 2028.

See also  CMA CGM, India deepen maritime dialogue

A 15-year commercial agreement has been signed with Swedish district energy provider Stockholm Exergi for the cross-border transport and storage of 900,000 tons of biogenic CO2 emissions annually as part of the Bio-Energy Carbon Capture and Storage (BECCS) project.

Industry Commitments and Future Prospects

Stockholm Exergi is the latest company to commit to Northern Lights, joining Heidelberg Materials, Celsio, Yara, and Ørsted. Discussions are ongoing with several European industrial customers to utilize the remaining storage capacity, signaling a growing interest in CO2 transport and storage solutions.

The Managing Director of Northern Lights JV, Tim Heijn, emphasized the importance of expanding CO2 transport and storage services to build a commercially viable CCS market in Europe. Equinor will continue as the technical service provider for phase two.

Executive Vice President Irene Rummelhoff from Equinor highlighted the crucial role of large-scale carbon capture, transport, and storage in achieving climate targets and enabling hard-to-abate industrial emitters to decarbonize their processes.

With the second phase of Northern Lights set to enhance CO2 transport and storage capabilities significantly, the project is poised to play a key role in Europe’s transition towards a more sustainable future.

662M booked Expansion FID fully Lights Northern partners Phase project
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

ILO to map gaps in Pakistan shipbreaking in the wake of HKC

July 1, 2025

Second floating solar plant on the way for Norway’s northernmost fish farm

June 30, 2025

AAL: Sixth methanol-ready MPP newbuild delivered

June 30, 2025
Top Posts

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Denmark awards first-ever offshore wind farm life extension permit

June 4, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Maritime

Mediterranean ECA Limits on Shipping’s Sulfur Emissions Are Now in Effect

May 1, 2025

The Launch of the Mediterranean Emission Control Area: A Step Towards Cleaner Seas The Mediterranean…

Unattended Helm Results in $2 Million Towing Vessel Grounding on Mississippi River

May 22, 2025

Last Surviving Ship Of “Battle of the Atlantic” Gets £225,000 Grant To Secure Its Future

January 27, 2025

Vertom’s eighth 7,280 dwt diesel-electric ship hits the water

April 12, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Keel Laying for Wind Flyer Trimaran Crew Boat

March 26, 2025

Maersk, Hapag Lloyd ready to pen new chapters for green shipping

January 31, 2025

Kongsberg Discovery: Demonstrations at Ocean Business 2025

April 6, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.