Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Belgian Energy Island in North Sea Starts Taking Shape (Video)
Offshore

Belgian Energy Island in North Sea Starts Taking Shape (Video)

May 2, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The Princess Elisabeth Island: A Landmark in Renewable Energy Infrastructure

TM Edison, a consortium of Belgian marine construction companies DEME and Jan De Nul, has achieved a significant milestone by installing the first two out of 23 caissons in the Belgian North Sea. This marks the commencement of construction for the Princess Elisabeth Island, touted as the ‘world’s first’ artificial energy island.

Caissons, concrete building blocks that outline the future island, are being used in the initial phase of construction. These structures will later be filled with sand to accommodate high-voltage infrastructure connecting new offshore wind farms.

Technical Complexity of Installation

The transport and installation of the 22,000-ton caissons at sea is a technically intricate operation that commenced on April 21, 2025. Each caisson, measuring 58 meters in length, 28 meters in width, and between 23 and 32 meters in height, is towed from the port of Vlissingen to the island site, covering a distance of approximately 98 kilometers.

Once at the destination, the caisson is connected to anchors and then filled with water to descend to the seabed in a controlled manner. Subsequent construction phases involve placing rock armor for protection, filling with sand, and preparing for the installation of the next caisson.

Strategic Importance of the Project

The Princess Elisabeth Island will play a crucial role in connecting future offshore wind farms in the Belgian North Sea. It represents a significant step towards expanding Belgium’s offshore electricity production and reducing dependence on fossil fuels.

The project is of paramount strategic importance and will be instrumental in shaping Belgium’s electricity supply in the years to come. Additionally, it offers opportunities for Belgium to integrate into a unified European electricity grid at sea.

See also  Two crewmen injured as OSV hits wind turbine in Dutch North Sea

Continued Progress and Challenges

Construction of the island and the implementation of HVAC contracts are progressing without interruption. However, delays in finalizing contracts for HVDC infrastructure have been encountered due to price increases.

Elia, the grid operator overseeing the project, is navigating these challenges within the legal framework while considering market dynamics. Discussions with federal authorities are ongoing to ensure a well-informed decision on the project’s future direction.

The Princess Elisabeth Island stands as a testament to Belgium’s commitment to renewable energy and innovative infrastructure development. As construction progresses, it heralds a new era in offshore energy production and paves the way for a sustainable energy future.

Belgian Energy Island North Sea shape Starts Video
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

North Sea yields ‘significant’ black gold discovery

August 21, 2025

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Top 16 Biggest LNG Ships

April 16, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025
Don't Miss
Port

Syria’s New Rulers Hand Operatorship of Port of Tartus to DP World

July 14, 2025

Syria Hands Port of Tartus Operations to DP World After ousting the previous Russian operator…

Singapore, Malaysia eye importing offshore wind power from Vietnam

May 28, 2025

Sinopec launches first floating offshore solar plant in China’s seawater zone

July 4, 2025

A Key Freight Indicator Is Flashing Red — Here’s What It Means for Global Trade

June 17, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Bayesian salvage: legal and commercial implications

May 22, 2025

Norway identifies four more offshore wind development sites

June 24, 2025

Allseas Takes Aim at Nuclear Power for Energy-Intensive Vessels

June 5, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.