Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Houthis Likely To Remain A Persistent Threat To U.S., Says Top Military Officer
  • SLB OneSubsea wins contract for Northern Lights phase two CO2 project
  • NTSB Finds Captain’s Navigation Error Led to Ohio River Grounding
  • Pacific Basin and Towngas enter green methanol supply MoU
  • Another gas asset switching back to online mode in the wake of Israel-Iran ceasefire
  • BOEM Looks to Open 80 million Acres for Oil and Gas Lease Sale
  • FET to Provide ROVs to Offshore Construction Firm
  • What Will Happen If Iran Closes The Strait of Hormuz?
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Oceaneering bags work on BP’s GTA field
Offshore

Oceaneering bags work on BP’s GTA field

May 10, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Oceaneering International Secures Multi-Year Contract with BP for Greater Tortue Ahmeyim Field

Houston-based Oceaneering International has been awarded a multi-year contract on BP’s Greater Tortue Ahmeyim field off Mauritania and Senegal.

The contract was awarded to Oceaneering’s offshore projects group by BP’s subsidiary BP Mauritania Investments for the provision of subsea inspection, maintenance, and repair services and remotely operated vehicle services.

Oceaneering will support this contract with one of its multi-purpose vessels outfitted with two work-class ROVs.

The scope of work will also include project management, engineering, and integration services provided by the company’s local and international personnel.

Engineering and pre-mobilisation activities have already begun, with field operations expected to start in the second quarter of 2025. The initial contract duration is three years, with two one-year options to extend.

The Greater Tortue Ahmeyim gas project produced first gas at the start of the year. The GTA floating facility, straddling the maritime border between Senegal and Mauritania, in water depths of up to 2,850 m, is expected to produce 2.3m tonnes of LNG per year in its first phase.

See also  Valaris bags $135m drillship deal in Africa
bags BPs Field GTA Oceaneering Work
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

SLB OneSubsea wins contract for Northern Lights phase two CO2 project

June 25, 2025

Geotechnical survey coming up at Dogger Bank D offshore wind site

June 25, 2025

Iberdrola picks Avangrid head as new CEO

June 25, 2025
Top Posts

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025

Coast Guard Overflight Footage Reveals Fire Spreading on Morning Midas Car Carrier Off Alaska Coast

June 6, 2025

Denmark awards first-ever offshore wind farm life extension permit

June 4, 2025
Don't Miss
Technology

Ice Calving Argentina’s Perito Moreno Glacier Stirs Awe and Concern

May 17, 2025

The Changing Face of Perito Moreno Glacier: A Spectacle of Calving Ice The deep cracking…

Egypt Halts Fertilizer Production In Light Of Israeli

June 15, 2025

Petronas kicking off LNG exports to Vietnam next month

March 28, 2025

Noble rig scores multi-well drilling gig offshore Suriname

January 1, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

UK company unveils design of its 20 MW tidal energy project in Wales

December 30, 2024

Transocean rig trio’s ongoing drilling gigs get an encore

February 13, 2025

First Substation Installed as Work Proceeds for Dominion’s Wind Farm

March 15, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.