Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Concern Raised for Major Shift in Antarctic Sea-Ice Coverage
  • Cybersecurity at sea: safeguarding in an era of AI-driven threats
  • Zamil Offshore’s New Fast Support Intervention Vessel Ready for Service
  • Finland Enforces World’s First Ban On Cargo Ships To Prevent Wastewater Discharge Into Coastal Waters
  • Britain’s Crown Estate Reports Profit of 1.15B Pounds, Led by Offshore Wind
  • Indian Navy Battles Engine Room Fire on Tanker in Gulf of Oman
  • Asia-Europe Schedule Reliability Defies European Port Congestion
  • SolarDuck tests interconnected offshore floating solar platforms in scaled MARIN trials
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»US Firm Debuts 20K Intervention Solution at Gulf of America Deepwater Field
Offshore

US Firm Debuts 20K Intervention Solution at Gulf of America Deepwater Field

May 13, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Trendsetter Engineering Deploys Trident 20K Intervention System at Shenandoah Project

Texas-based subsea oil and gas equipment supplier, Trendsetter Engineering, has achieved a significant milestone with the first deployment of its Trident 20,000 psi (20K) intervention system at Beacon Offshore’s Shenandoah project in the Gulf of America.

The Trident 20K intervention system was successfully deployed from Transocean’s Deepwater Atlas drillship for a two-well flowback operation at the deepwater Shenandoah project. Trendsetter efficiently wet-hopped the Trident 20K system between wells, resulting in substantial cost savings and reducing critical path rig time for the client. The system has now been returned to Trendsetter for post-campaign maintenance to ensure readiness for future operations.

According to Trendsetter Engineering, the launch of the first 20K Open Water Intervention Riser System (OWIRS) marks a significant achievement for the industry. This deployment follows the successful delivery of the 20K production manifold and associated surf components by Trendsetter.

The Shenandoah field is situated approximately 230 miles from New Orleans, with water depths reaching up to 5,500 feet. The production from the Shenandoah floating production system (FPS) is expected to commence in June 2025, with an estimated production rate of 120,000 barrels of oil per day once operational.

Shenandoah Phase 2 Development

Beacon Offshore and its partners have greenlit the next phase of development at Shenandoah, known as Shenandoah Phase 2. The planned operations for Shenandoah Phase 2 include the drilling and completion of two additional producing wells, expanding the Shenandoah FPS throughput capacity to 140,000 bopd through debottlenecking activities by early 2026, and installing a subsea booster pump to provide hydraulic support by reducing back pressure on the wells in the dual infield flowline and riser system.

See also  Rosetti Marino gets UK CCS gig from Eni worth north of $340m

Beacon Offshore anticipates that the activities associated with Shenandoah Phase 2 will be carried out between 2025 and 2028, further solidifying the project’s long-term development and production goals.

Overall, the successful deployment of the Trident 20K intervention system at the Shenandoah project demonstrates Trendsetter Engineering’s commitment to innovation and efficiency in the subsea oil and gas industry. With continued advancements in technology and operational excellence, Trendsetter and its partners are poised to drive further success in the offshore energy sector.

20K America debuts deepwater Field Firm Gulf Intervention solution
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Zamil Offshore’s New Fast Support Intervention Vessel Ready for Service

July 1, 2025

Britain’s Crown Estate Reports Profit of 1.15B Pounds, Led by Offshore Wind

July 1, 2025

Indian Navy Battles Engine Room Fire on Tanker in Gulf of Oman

July 1, 2025
Top Posts

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Denmark awards first-ever offshore wind farm life extension permit

June 4, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Oil & Gas

BP’s fourth subsea gas project is a go as new discovery springs up in Trinidad and Tobago

April 3, 2025

BP Trinidad and Tobago Announces New Gas Find and Investment Decision BP Trinidad and Tobago…

US Targets Iran With New Sanctions Amidst Shadow

June 6, 2025

PTP becomes the first in Malaysia to cross 12 million TEUs in 2024

January 4, 2025

Search for missing crew member called off

March 11, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

U.S. Launches First Deep-Sea Mineral Lease Evaluation in 30 Years Near American Samoa

May 21, 2025

Seiche Welcomes Hook as Non-Executive Director

January 20, 2025

Prisma DI-5, Prisma DI-5C Crankshaft Deflection Indicators

April 24, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.