Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Nepal Accepts WTO Agreement on Fisheries Subsidies
  • Saipem Milestone in Guyana Yellowtail Project
  • Port Of Arkhangelsk Welcomes First Chinese Vessel Of 2025 Via Arctic Express N1
  • SeaBird scores OBN work for survey vessel
  • Inyanga Marine Energy Group appoints new chair of the board
  • Shell shakes hands with three players to boost offshore unit safety
  • Can hydrogen make good on its clean energy potential?
  • The Untold Plight Of North Korean Seafood Workers in China
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Cable milestone reached for world-first offshore solar-wind integration at HKN1
Offshore

Cable milestone reached for world-first offshore solar-wind integration at HKN1

May 14, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The First Dynamic Subsea Power Export Cable for Offshore Solar Project at HKN1 Wind Farm Successfully Tested and Delivered

The dynamic subsea power export cable for the HKN1 offshore solar project at the Hollandse Kust Noord (HKN) offshore wind farm, the first of its kind connected to an offshore wind grid, has been tested and delivered.


Source: Oceans of Energy

Oceans of Energy and CrossWindHKN confirmed the completion of the factory acceptance test (FAT) at NKT’s production facility in Sweden.

Following the test, the cable was transported to the project site in the Dutch North Sea, where it will be installed at the HKN offshore wind farm, Oceans of Energy noted.

“Initially, sourcing a dynamic subsea power export cable was challenging due to the rough wave conditions of the North Sea,” said Tijmen Smit, Project Manager HKN1 at Oceans of Energy.

“However, with the advanced properties of the NKT cable, our team executed complex engineering to achieve an optimal design configuration. The next step is installation, after which this cable will be the first cable in the North Sea that supplies offshore solar energy to an offshore wind turbine grid.”

Jeroen van Loon from CrossWindHKN said the milestone was achieved thanks to the joint efforts of NKT and Oceans of Energy.

“With the delivery of the dynamic subsea power export cable, we’re ready to connect for the first time in the world an offshore solar farm into the infrastructure of an offshore wind farm,” van Loon added.

Technical Advancements in Offshore Energy Integration

The project marks a technical step in the integration of offshore solar with existing wind infrastructure. CrossWind’s Hollandse Kust Noord project is a 759 MW offshore wind project that will use technologies and engineering solutions to improve the flexibility of offshore wind farms.

See also  Data-driven cable monitoring extended at world’s largest tidal array

The project has many first-offs, including being the first wind farm in the world with an offshore combination of battery storage and round-trip green hydrogen produced from offshore wind power on a megawatt scale. Once constructed, the offshore wind farm will generate at least 3.3 TWh of clean energy per year.

Progress and Milestones

Oceans of Energy was awarded the contract for installing and operating an offshore solar farm inside the Hollandse Kust Noord offshore wind park in April 2023.

In October 2024, the first floating solars for the Hollandse Kust Noord (HKN) offshore solar farm arrived at the Port of Amsterdam, set for installation at the Dutch CrossWind HKN offshore wind farm.

cable HKN1 integration milestone Offshore reached solarwind worldfirst
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Saipem Milestone in Guyana Yellowtail Project

August 18, 2025

SeaBird scores OBN work for survey vessel

August 18, 2025

Shell shakes hands with three players to boost offshore unit safety

August 18, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025
Don't Miss
Environment

Solvang LPG Tanker Ready to Launch New Onboard Carbon Capture Pilot

January 17, 2025

Pilot Project Launches Onboard Carbon Capture and Storage System A pilot project involving Wärtsilä, MAN…

Argeo chief executive officer steps down

April 6, 2025

Ireland Commits to More Offshore Wind Auctions Amidst Industry Struggles

April 12, 2025

Alphard Maritime subsidiary hires PSV for ONGC

May 10, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Explosions, Fires on Cargo Ship Off India’s Kerala Coast

June 9, 2025

Russia Claims Ukrainian Attack on TurkStream Subsea Pipeline System

January 14, 2025

Odfjell Drilling rig finds more gas/condensate offshore Norway

March 4, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.