Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Oil & Gas»Greece’s FSRU going back to regasification work in August
Oil & Gas

Greece’s FSRU going back to regasification work in August

May 17, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Greece’s FSRU Alexandroupolis to Resume Regasification Services

A floating storage and regasification unit (FSRU) that brought Greece its first offshore liquefied natural gas (LNG) terminal is gearing up to return to regasification duty after a brief suspension.

In late January 2025, regasification services were halted due to a technical issue that damaged the booster pumps on board the FSRU Alexandroupolis in the Aegean Sea. Gastrade, the operating firm, has been diligently working to repair the booster pumps and address the issue.

According to Gastrade, the restart of regasification activities is scheduled for August 15, 2025, pending the completion of the necessary remediation works. Initially, the regasification capacity will be limited to 25% of the terminal’s maximum sustainable capacity of approximately 41.5 GWh/day, with additional redundancy in booster pumps. This limited capacity will be available from August 15 to September 30, 2025, subject to specific operational and commercial conditions.

After September 30, 2025, the cap on regasification capacity is expected to be lifted, although some operational constraints may persist temporarily. The FSRU Alexandroupolis, previously known as the LNG carrier GasLog Chelsea, underwent a ten-month conversion in Singapore before being deployed to Greece.

Since its arrival in late 2023, the FSRU has played a crucial role in Greece’s energy landscape, receiving its first LNG cargo in February 2024. With an annual regasification capacity of around 5.5 billion cubic meters, the FSRU is poised to support Gastrade’s expansion plans for the Alexandroupolis LNG terminal, including the addition of a second unit with similar technical capabilities.

Recognizing the ongoing demand for fossil fuels in Southeastern Europe, Gastrade secured a five-year supply agreement with Venture Global to source LNG from the company’s terminals in Louisiana for markets in Central and Eastern Europe (CEE).

See also  Baker Hughes picked to work on making Texas LNG terminal 'one of the largest' in the world

August FSRU Greeces regasification Work
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

North Sea yields ‘significant’ black gold discovery

August 21, 2025

Strohm’s TCP jumpers make their way to Malaysian deepwater sector

August 21, 2025

Petrobras hands out $640M in ROV support vessel contracts to compatriot firm

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Maritime

Mediterranean Leaders Discuss Migration Route

August 3, 2025

The Mediterranean Migration Route: A Top Issue for Turkey, Italy, and Libya The migration route…

EU Approves €11 Billion French Program to Aid Offshore Wind Energy

August 6, 2025

Australian professor makes ‘Google Maps for the sea’ claim in bid to cut shipping emissions

June 13, 2025

R.M. Young: President Transition as Namesake Tom Young Retires

April 13, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Metstrade 2025 expands to fill whole of RAI Amsterdam

May 3, 2025

US bestows export permit into Golden Pass LNG terminal’s hands as start-up edges closer

March 6, 2025

America and UK put two Russian oil majors on blacklist, as US sanctions spree spreads to 183 ‘shadow fleet’ vessels

January 14, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.