Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Vessel Concept Meets Challenges of Floating Wind Turbine Installation
Offshore

Vessel Concept Meets Challenges of Floating Wind Turbine Installation

May 22, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Revolutionizing Offshore Wind Installation: The Future FLOW Installation Vessel

A consortium based in the UK is pioneering the development of a groundbreaking vessel tailored to support the emerging segment of floating offshore wind installations. As the offshore wind energy industry transitions towards floating turbines, there arises a crucial need for specialized vessels capable of efficiently positioning and anchoring these structures.

According to Ian Godfrey from Tope Ocean, an engineering firm involved in the project, “The current global fleet is inadequate for the serialized installation of floating turbines and their accompanying infrastructure.”

The vessel concept is designed to address a critical aspect of the floating wind installation process that has yet to be optimized. It will accommodate various anchor types, including drag embedment anchors, suction piles, and driven piles, essential for securing floating wind turbines in diverse offshore environments.

Key Features of the Future FLOW Installation Vessel

The vessel’s design, now in the feasibility stage, is tailored to meet the evolving demands of the offshore wind industry. It will specialize in installing mooring lines onto anchors swiftly, facilitating the seamless connection of floating foundations at offshore sites. The vessel boasts a range of innovative features, including:

  • Utilization of low-carbon fuels for enhanced fuel efficiency
  • Hydrodynamically optimized hull for improved performance
  • Expanded mooring capacity to accommodate various anchor types

Future FLOW Installation Vessel

Efficiency and Sustainability at the Core

Simon Hindley from Solis Marine Engineering emphasizes, “We’ve reimagined the mooring installation process with a vessel tailored to meet these new requirements.” By integrating an energy-efficient hull design with a low-emission powertrain, the vessel aims to enhance construction efficiency while minimizing environmental impact. The use of alternative fuels like methanol further underscores the vessel’s commitment to sustainability.

The vessel’s propulsion system, equipped with azimuth thrusters, ensures optimal station-keeping and dynamic positioning efficiency. Additionally, large below-deck cable tanks and chain lockers are incorporated to accommodate the extensive mooring ropes and chains required for floating wind installations.

Advancing Clean Maritime Technology

The Future FLOW Installation Vessel project is part of the Clean Maritime Demonstration Competition Round 4 (CMDC4), supported by the UK Department for Transport and Innovate UK. Consortium partners include Solis Marine Engineering, Tope Ocean, First Marine Solutions, and Celtic Sea Power.

The consortium is progressing towards the next design phase, focusing on optimizing equipment for handling synthetic ropes, conducting weather-limit analyses, and addressing regulatory challenges associated with methanol propulsion systems. The ultimate goal is to obtain Approval in Principle from a leading ship classification society by December 2025.

See also  Polish duo links up for offshore wind newbuilds
challenges concept Floating Installation Meets Turbine Vessel Wind
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Oil & Gas

Australian player eyeing entry into Namibia’s frontier basin

April 18, 2025

Grand Gulf Energy Eyes Acquisition of Petroleum Exploration License in Offshore Namibia Australia-headquartered exploration and…

Top 10 Biggest Ice Breaker Ships in the World in 2024

February 5, 2025

Study Reveals Growing Crisis of Fatigue and Healthcare Access Among Seafarers

May 29, 2025

Fugro Gets On Board Ireland’s Offshore Grid Development Project

July 19, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Seventh-gen drillship kicks off its maiden drilling gig with Petrobras

April 21, 2025

Tanker Barred From India, Transferring its Russian oil at Sea

April 5, 2025

Norwegian wave energy converter achieves over 80% conversion rate in lab test

June 18, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.