Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Cybersecurity at sea: safeguarding in an era of AI-driven threats
  • Zamil Offshore’s New Fast Support Intervention Vessel Ready for Service
  • Finland Enforces World’s First Ban On Cargo Ships To Prevent Wastewater Discharge Into Coastal Waters
  • Britain’s Crown Estate Reports Profit of 1.15B Pounds, Led by Offshore Wind
  • Indian Navy Battles Engine Room Fire on Tanker in Gulf of Oman
  • Asia-Europe Schedule Reliability Defies European Port Congestion
  • SolarDuck tests interconnected offshore floating solar platforms in scaled MARIN trials
  • Newly formed Houston firm sheds subsea tree business to focus on core product lines
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Wood bags work on ADNOC’s massive project off UAE
Offshore

Wood bags work on ADNOC’s massive project off UAE

May 25, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Wood Awarded Contract for ADNOC Offshore’s Lower Zakum Long-Term Development Phase 1 Project

UK consulting and engineering firm Wood has been awarded a contract to deliver the detailed engineering design for one of the packages for ADNOC Offshore’s Lower Zakum Long-Term Development Phase 1 project.

The contract for work on the so-called Package 5 was secured from Target Engineering, the appointed EPC contractor for this phase of the project.

Located on Das Island in the United Arab Emirates, around 65 km northwest of Abu Dhabi in the central Arabian Gulf, Lower Zakum Field is one of ADNOC’s strategically significant offshore assets.

The Long-Term Development Phase 1 project aims to expand and sustain production capacity of 450,000 barrels per day up to 2035. Under this project, Package 5 facilities will include three new oil processing trains, including separation, a desalter, dehydration, an oil stabilisation system, a new seawater offshore platform, and other related utility facilities.

Wood’s team of engineers will develop crude oil stabilisation mechanisms at Das Island, which will support the sustainable production of oil at the site until 2035.

More than 200 Wood engineers from across the UAE, India, and the UK will support this project for the next two years.

Wood has previously completed a successful front-end engineering and design scope under Lower Zakum, following its work on ADNOC’s Early Production Scheme-2 project in 2024.

See also  $5 billion loan dusting off the cobwebs from TotalEnergies’ stalled $20B LNG project
ADNOCs bags Massive project UAE Wood Work
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Zamil Offshore’s New Fast Support Intervention Vessel Ready for Service

July 1, 2025

Britain’s Crown Estate Reports Profit of 1.15B Pounds, Led by Offshore Wind

July 1, 2025

Danos Nets Production Services Contract for Beacon Offshore’s Shenandoah FPS

July 1, 2025
Top Posts

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Denmark awards first-ever offshore wind farm life extension permit

June 4, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Offshore

Nexans to deliver second Malta-Italy interconnector, ten years after the first one

April 29, 2025

Nexans Secures Contract to Deliver Second Malta-Sicily Interconnector Nexans has secured a contract with government-owned…

MOL and partners get green light for large ammonia-powered ammonia carrier design

March 16, 2025

ABS, Akselos Sign Floating Wind MOU

December 29, 2024

EPS names final 7,000 CEU dual-fuel car carrier in China

May 13, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

RISEnergy seeks projects slashing life cycle costs across renewable energy tech

April 17, 2025

Purus’ CSOV Newbuild Ready for Offshore Wind Ops (Video)

April 17, 2025

Ice Calving Argentina’s Perito Moreno Glacier Stirs Awe and Concern

May 17, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.