Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • US approves OCI Global’s sale of methanol business to Methanex
  • Talks about 40-year continuation of Australia’s mega gas project draw out
  • Seequent’s Visible Geology Used By 90,000 Worldwide
  • Tallest Maritime Oil Rig Ever Deployed
  • Walter Thomassie, Managing Director, Thoma-Sea Marine Constructors, LLC
  • Everllence and Plastic Fischer Partner in Fight Against Plastic Waste
  • Equinor awards plug and abandonment job to Baker Hughes
  • ESPO: ‘Right conditions’ need to be created for ports to implement Clean Industrial Deal
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Oil & Gas»$9 billion deals for US LNG project land on Bechtel’s worksheet in Lone Star State
Oil & Gas

$9 billion deals for US LNG project land on Bechtel’s worksheet in Lone Star State

June 15, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

NextDecade Corporation Announces Price Changes and Multibillion-Dollar Deal with Bechtel Energy

Houston-headquartered energy player NextDecade Corporation has recently made significant announcements regarding pricing changes for existing contracts and a new multibillion-dollar deal with Bechtel Energy. The collaboration between these two American companies is set to facilitate the construction of liquefied natural gas (LNG) export facilities in the Port of Brownsville, Texas.

Phase 1 of Rio Grande LNG Project

After the final investment decision (FID) for Phase 1 of the Rio Grande LNG project was made in July 2023, Bechtel Energy received approval to proceed with the full construction of the project. This construction officially commenced in October 2023.

The lump sum turnkey engineering, procurement, and construction (EPC) contract for Train 4 and related infrastructure at the Rio Grande LNG project was initially valued at approximately $4.3 billion, with the price validity extending through December 31, 2024.

Price Changes and New Contracts

NextDecade’s subsidiaries have finalized a pricing refresh for the EPC contract with Bechtel for Train 4 and related infrastructure. Additionally, a new lump-sum, turnkey EPC contract has been executed for the construction of Train 5 and related infrastructure at the Rio Grande LNG facility.

Under the revised agreement, Rio Grande LNG Train 4 will pay Bechtel approximately $4.77 billion for the work, with pricing validity extending through September 15, 2025. Train 5 has struck a $4.32 billion deal with Bechtel, with pricing validity also extending through the same date.

Future Prospects

NextDecade anticipates achieving a positive FID on Train 4 before the pricing validity period ends, subject to securing adequate financing. There are also plans to commercialize an additional 2.5 mtpa under long-term LNG SPAs to support the positive FID on Train 5.

See also  Testing Begins for System to Address Methane Slip from LNG Marine Engines

With the potential to expand the Rio Grande LNG facility to include up to ten liquefaction trains, the project represents a significant development in the LNG industry. Additionally, NextDecade is exploring the implementation of a carbon capture and storage (CCS) project at the site to contribute towards a lower-carbon future.

Located near Brownsville, Texas, the Rio Grande LNG project is expected to offer substantial emissions reductions, positioning it as a leader in sustainability within the LNG sector.

Bechtels Billion deals Land LNG Lone project Star State worksheet
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Talks about 40-year continuation of Australia’s mega gas project draw out

June 15, 2025

Baltic CO2 storage project gets EU funding

June 15, 2025

ConocoPhillips pinpoints potential drilling sites for 2025 two-well gas search

June 15, 2025
Top Posts

Coast Guard Overflight Footage Reveals Fire Spreading on Morning Midas Car Carrier Off Alaska Coast

June 6, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025

Tallest Lighthouse Still in Operation at Sea

May 30, 2025
Don't Miss
Offshore

Borr Drilling gets suspensions for three rigs working in Mexico

January 17, 2025

Borr Drilling Faces Temporary Suspension of Operations for Three Rigs in Mexico The Oslo and…

Dredging for cyanide underway in toxic Walsall Canal

April 7, 2025

Trump makes good on promise to halt offfshore wind

January 21, 2025

UK’s Crown Estate Gives Green Light to Expand Capacity at Offshore Wind Sites

May 9, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Yamaha posts mixed results for fiscal year 2024

February 14, 2025

‘Larger’ slice for oil & gas exploration on Norway’s new offshore licensing menu

May 10, 2025

What Are Microskiff Boats?

March 7, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.