Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»All Inter-Array Cables Installed at 488 MW French Offshore Wind Farm
Offshore

All Inter-Array Cables Installed at 488 MW French Offshore Wind Farm

June 24, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The Final Inter-Array Cable Installed at EMYN Offshore Wind Farm in France

The completion of the final inter-array cable installation at the Îles d’Yeu and Noirmoutier (EMYN) offshore wind farm in France marks a significant milestone in the project’s development. Les Éoliennes en Mer Services, the developer behind the wind farm, announced the successful installation of the 61st inter-array cable on June 22.

With this achievement, the EMYN offshore wind farm is now poised to have a transmission capacity of 512 MW, bringing it closer to full operational capacity. Geoquip Marine’s Geoquip Elena, specially converted into a Cable Laying Vessel (CLV) with a project-specific deck layout, played a crucial role in the installation process.

According to Louis Dreyfus TravOcean, the vessel will be demobilized from the Dunkirk offshore base in early July, following the successful completion of the cable installation. Prysmian, responsible for the termination and testing activities, conducted these crucial tasks from Island Offshore’s service operation vessel (SOV) Island Diligence, ensuring that all systems are functioning optimally.

Once fully operational, the EMYN offshore wind farm will feature 61 wind turbines, each rated at 8 MW, with a total installed capacity of 488 MW. This capacity will enable the wind farm to generate 1,900 GWh per year, equivalent to the electricity consumption of 800,000 people.

The project is on track to be fully commissioned by the end of 2025, providing a significant boost to France’s renewable energy goals and contributing to the country’s transition to a more sustainable energy future.

See also  GLO Marine, VMS Group Land Multi-Vessel Retrofit Job for Tidewater
Cables Farm French Installed interarray Offshore Wind
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Hanwha Ocean and Hyundai E&C form offshore wind partnership

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Technology

Greensea IQ to Supply Crawler to U.S. Marine Corps

February 9, 2025

Greensea IQ Awarded $5.36 Million Contract for Amphibious Underwater Ground Vehicle Subsea robotics company Greensea…

Finnish Coast Guard Monitoring Tankers as One Drifts with Engine Troubles

December 30, 2024

The Five Ws (And How) Of The IMO Polar Code

August 14, 2025

EU Presents European Ocean Pact

June 11, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Ulstein to retrofit 2024-built CSOV Olympic Notos for oil and gas contract

August 5, 2025

MSC’s cruise division officially opens new sustainable terminal in Barcelona

April 10, 2025

Maersk Containership Drifting Off Bermuda After Engine Room Incident, Three Crew Injured

May 5, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.