Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • ‘Biggest’ green shore power system switches on
  • France’s CO2 storage deal with Norway paving the way for common European CCS market
  • Industrial Partners Unite Behind Floating Hydrogen Project
  • Aker BP Installs New Jacket at Valhall Field in Southern North Sea (Video)
  • Greek Navy Deploys Warships To Thwart Surge Of Migrant Vessels Off Libya
  • Norway identifies four more offshore wind development sites
  • Saudi 2030 Vision in the making: SGP wins 20-year concession for four multipurpose terminals
  • WATCH: DeepOcean wraps up ‘deepwater milestone’ at gas field in Norwegian waters
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»All Inter-Array Cables Installed at 488 MW French Offshore Wind Farm
Offshore

All Inter-Array Cables Installed at 488 MW French Offshore Wind Farm

June 24, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The Final Inter-Array Cable Installed at EMYN Offshore Wind Farm in France

The completion of the final inter-array cable installation at the Îles d’Yeu and Noirmoutier (EMYN) offshore wind farm in France marks a significant milestone in the project’s development. Les Éoliennes en Mer Services, the developer behind the wind farm, announced the successful installation of the 61st inter-array cable on June 22.

With this achievement, the EMYN offshore wind farm is now poised to have a transmission capacity of 512 MW, bringing it closer to full operational capacity. Geoquip Marine’s Geoquip Elena, specially converted into a Cable Laying Vessel (CLV) with a project-specific deck layout, played a crucial role in the installation process.

According to Louis Dreyfus TravOcean, the vessel will be demobilized from the Dunkirk offshore base in early July, following the successful completion of the cable installation. Prysmian, responsible for the termination and testing activities, conducted these crucial tasks from Island Offshore’s service operation vessel (SOV) Island Diligence, ensuring that all systems are functioning optimally.

Once fully operational, the EMYN offshore wind farm will feature 61 wind turbines, each rated at 8 MW, with a total installed capacity of 488 MW. This capacity will enable the wind farm to generate 1,900 GWh per year, equivalent to the electricity consumption of 800,000 people.

The project is on track to be fully commissioned by the end of 2025, providing a significant boost to France’s renewable energy goals and contributing to the country’s transition to a more sustainable energy future.

See also  Former PSV outfit Standard Supply dives into crypto as StandardCoin
Cables Farm French Installed interarray Offshore Wind
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Aker BP Installs New Jacket at Valhall Field in Southern North Sea (Video)

June 24, 2025

Norway identifies four more offshore wind development sites

June 24, 2025

Geotechnical survey underway at Ørsted’s Isle of Man offshore wind farm

June 24, 2025
Top Posts

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025

Coast Guard Overflight Footage Reveals Fire Spreading on Morning Midas Car Carrier Off Alaska Coast

June 6, 2025

Denmark awards first-ever offshore wind farm life extension permit

June 4, 2025
Don't Miss
Technology

Kongsberg Discovery Launches Digital “Librarian”

April 9, 2025

Kongsberg Discovery Unveils Geomatics: Revolutionizing Ocean Data Management Kongsberg Discovery has introduced Geomatics, a cutting-edge…

Dutch terminal’s open season checking the pulse of LNG import demand after 2027

February 3, 2025

US administration urged to stave off drilling in Carolinas’ outer shelf

June 19, 2025

Students To Demonstrate Potential Of Liquified

January 3, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

MODEC gets its hands on 20-year FPSO job with Shell for Brazilian oil & gas development

March 25, 2025

BOEM Advances Leasing For Gom Offshore Wind Energy

December 23, 2024

Unprecedented Bleaching Event Affects 84 Percent of World’s Corals

April 27, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.