Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • KIMM Cracks the Code for Underwater Radiated Noise Prediction
  • North Star Accelerates Green Transition
  • Iran Loaded Out Naval Mines in Preparation to Close Hormuz
  • Ørsted terminates deal for Cadeler’s newbuild
  • Has shipping painted itself into a CO2 corner?
  • PowerCell lands order for new MS-500 marine fuel cell system
  • EPCC deal inked for next stage of Thailand’s third LNG terminal
  • Teledyne Acquires Maretron
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Energy»SolarDuck tests interconnected offshore floating solar platforms in scaled MARIN trials
Energy

SolarDuck tests interconnected offshore floating solar platforms in scaled MARIN trials

July 1, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

SolarDuck Completes Successful Test Campaign at MARIN with Interconnected Offshore Floating Solar Platforms

Dutch-Norwegian firm SolarDuck has recently completed an innovative test campaign at the Maritime Research Institute Netherlands (MARIN), showcasing the capabilities of their offshore floating solar platforms. The campaign involved 54 interconnected platforms, with a combined real-world capacity of approximately 6 MWp (megawatt peak).

This marks SolarDuck’s third test round at the MARIN offshore basin, demonstrating the company’s commitment to pushing the boundaries of sustainable energy solutions.

“We started two years ago with a single triangular platform, scaled up to six in the HEX-1 layout, and now to 54 platforms in the HEX-3 configuration,” shared SolarDuck in a social media post, highlighting the evolution of their design and testing process.

The project involved scaling down SolarDuck’s full-scale design to a 1:20 model, utilizing carbon tubes and lightweight connectors to replicate mechanical behavior accurately.

According to SolarDuck, the test focused on the dynamic response of multi-body systems, examining coupling forces, mooring loads, and the impact of wind, currents, and waves on the interconnected platforms.

One significant observation made during the campaign was the damping effect of wind across the array, with wind visibly reducing platform motion as it passed over the system.

“Wind has a clear damping effect on the platforms, which was evident in both single platform tests and across the full 54-platform array. This insight will be valuable as we continue to optimize our designs for real-world applications,” noted SolarDuck.

The campaign also included decay testing of single platforms, essential for future deployments in remote locations. SolarDuck praised MARIN’s motion tracking system for its support in conducting the research effectively.

See also  Symphony Wave Power gears up for sea trials after prototype assembly completion

MARIN’s Offshore Basin: A Hub for Innovation

MARIN’s Offshore Basin serves as a crucial facility for simulating and testing the behavior of offshore structures in various environmental conditions. The basin, measuring 45 x 36 x 10.2 meters, is equipped to test structures in waves, wind, and current, providing valuable insights for companies like SolarDuck.

In January, SolarDuck conducted tests for its updated floating solar platform design at MARIN as part of the DEI+ Merganser project consortium, showcasing the ongoing collaboration between industry and research institutions in advancing renewable energy technologies.

With successful test campaigns like the one at MARIN, SolarDuck continues to demonstrate its leadership in the field of offshore floating solar platforms, paving the way for sustainable energy solutions in the maritime industry.

Floating interconnected MARIN Offshore Platforms scaled solar SolarDuck Tests trials
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

PowerCell lands order for new MS-500 marine fuel cell system

July 2, 2025

All inter-array cables in place at Germany’s 960 MW offshore wind farm

July 2, 2025

In a landmark move, OSPAR bans scrubber discharges in North-East Atlantic waters

July 2, 2025
Top Posts

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Denmark awards first-ever offshore wind farm life extension permit

June 4, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Offshore

Velesto bags $90m jackup deal in Indonesia

May 23, 2025

Velesto Energy Secures Offshore Drilling Contract in Indonesia Malaysia’s Velesto Energy has announced that its…

James Fisher Launches Japanese Business Unit

February 18, 2025

PEAK Wind Enters into OMA to Oversee Wind Farm Operations

March 26, 2025

New hybrid-electric SOV for EnBW’s He Dreiht offshore wind farm enters construction

February 27, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Trump’s Offshore Wind Halt Risks $28 Billion of Investment

April 19, 2025

UK Proposes New Port Reforms to Aid Development and Investment

June 7, 2025

EMEC appoints new leadership team 

March 13, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.