Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Offshore work starts at PGE and Ørsted’s 1.5 GW project site in Poland
Offshore

Offshore work starts at PGE and Ørsted’s 1.5 GW project site in Poland

July 11, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The Beginning of Preparatory Work for Poland’s Largest Offshore Wind Farm

The vessel Olympic Electra has begun relocating boulders at the Baltica 2 project site, marking the start of the preparatory work ahead of offshore construction of what will be the biggest offshore wind farm in Poland.

Boulder relocation is a key stage in preparing for the installation of foundations and underwater infrastructure, Ørsted, which owns the wind farm together with PGE Polska Grupa Energetyczna, said via social media on July 9.

According to the video Ørsted shared, the campaign is expected to be underway for around six months.

“As the leader of the offshore part of the Baltica 2 project, we’re very excited to be embarking on advanced work in the Polish part of the Baltic Sea”, said Ulrik Ankerstjerne Lange, Vice President and Managing Director of the Baltica 2 project, Ørsted.

Ørsted and PGE took the final investment decision (FID) on Baltica 2 at the beginning of this year, moving the project into the construction phase.

The project will feature 107 Siemens Gamesa 14 MW-222 turbines, for whose storage, pre-assembly, and offshore installation, the wind turbine manufacturer will use the Port of Gdansk.

Navantia-Windar will be supplying 77 monopile foundations for the project’s turbines and substations, while Steelwind Nordenham will deliver the remaining 34 wind turbine foundations for Baltica 2.

The 1.5 GW offshore wind farm is planned to be fully commissioned by the end of 2027.

𝐃𝐨 𝐲𝐨𝐮 𝐰𝐚𝐧𝐭 𝐭𝐨 𝐠𝐫𝐚𝐛 𝐭𝐡𝐞 𝐚𝐭𝐭𝐞𝐧𝐭𝐢𝐨𝐧 𝐨𝐟 𝐲𝐨𝐮𝐫 𝐭𝐚𝐫𝐠𝐞𝐭 𝐚𝐮𝐝𝐢𝐞𝐧𝐜𝐞 𝐢𝐧 𝐨𝐧𝐞 𝐦𝐨𝐯𝐞?

See also  Benthic survey wraps up for Scottish floating wind farm

𝐇𝐮𝐫𝐫𝐲 𝐮𝐩 𝐚𝐧𝐝 𝐭𝐚𝐤𝐞 𝐚𝐝𝐯𝐚𝐧𝐭𝐚𝐠𝐞 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐮𝐦𝐦𝐞𝐫 𝐬𝐚𝐥𝐞 𝐝𝐢𝐬𝐜𝐨𝐮𝐧𝐭 𝐨𝐟 𝐮𝐩 𝐭𝐨 𝟓𝟎% 𝐨𝐧 𝐚𝐝𝐯𝐞𝐫𝐭𝐢𝐬𝐢𝐧𝐠 𝐩𝐚𝐜𝐤𝐚𝐠𝐞𝐬!

Offshore Ørsteds PGEand Poland project site Starts Work
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

UK Funds Project to Combine Carbon and Emission Capture in Southampton

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Maritime

China Begins Construction Of 2000-Meters Deep-Sea Manned Laboratory

March 6, 2025

China has started the construction of a deep-sea manned research laboratory in Guangzhou. The facility,…

Israel Launches Drone Attack on Hodeidah Port in Yemen

July 21, 2025

Japan’s K-Line Plans To Divert More Ships Away From U.S. Over Rising Tariffs

July 18, 2025

Vantage Drilling still waiting for green light on $80m drillship deal

July 24, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Norwegian man wakes up to containership in his garden

May 24, 2025

Japan developing green energy-powered offshore data centres

March 28, 2025

Air Liquide reaches FID on 200 MW electrolyzer project at Port of Rotterdam

July 27, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.