Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Ferretti Group’s results steady as it looks to expand product offering
  • Port of Nigg’s owner passes the baton to Japanese investor
  • SAAM to expand green fleet with new tug duo for Chile and Peru
  • BP and Eni set their cap on stepping up Mediterranean oil & gas game
  • Voyis Unveils Updated Visual Acquisition Software for Enhanced Subsea Inspection
  • Scotland Gives SSE Plc Consent To Build World’s Largest Offshore Wind Farm
  • Nexans and Crowley Launch Jones Act Cable Lay Barge for U.S. Offshore Wind
  • BYD takes delivery of new 7,000 CEU LNG dual-fuel car carrier
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»FLNG Capacity to Jump
Offshore

FLNG Capacity to Jump

July 30, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The Rise of Floating LNG Terminals: A Game-Changer in the Global LNG Market

Floating liquefied natural gas (FLNG) terminals are revolutionizing the global LNG market, with their capacity expected to triple by 2030, as per research from Rystad Energy. Overcoming initial technical and operational challenges, FLNG projects are now matching the utilization rates of traditional onshore terminals. With the demand for LNG on the rise and the feasibility of tapping into smaller gas fields, FLNG is emerging as a more agile, cost-effective solution capable of adapting to dynamic market conditions and unlocking previously inaccessible reserves.

Projected Growth in FLNG Capacity

Rystad Energy predicts that global FLNG capacity will reach 42 million tonnes per annum (Mtpa) by 2030, surging to 55 Mtpa by 2035, nearly four times the capacity recorded in 2024. Terminals commissioned before 2024 achieved impressive utilization rates, comparable to onshore LNG facilities, showcasing the increasing efficiency and reliability of FLNG technology.

Technological Advancements and Cost Efficiency

Early FLNG projects faced challenges, such as the costly construction of Shell’s Prelude in South Korea. However, the industry has learned from these experiences, leading to a significant reduction in capital expenditure per tonne. Proposed projects along the US Gulf Coast now boast lower costs, with vessel conversions proving to be a cost-effective alternative to newbuild facilities.

Operational Flexibility and Mobility

FLNG vessels offer operational flexibility across various environments, from deepwater to onshore supply. In case of project delays, these vessels can be relocated or sold, highlighting their mobility and adaptability. This flexibility allows for quicker decision-making and faster revenue generation, crucial in the current energy landscape.

See also  Singapore, Malaysia eye importing offshore wind power from Vietnam

Accelerated Project Timelines

Rystad Energy data indicates that FLNG units can be delivered faster than onshore liquefaction facilities, reducing construction timelines and minimizing cost overruns. The average build time for new FLNG projects is approximately three years, compared to 4.5 years for onshore plants. This expedited timeline is driving the growing preference for FLNG as developers aim to maximize returns swiftly.

With the increasing demand for LNG and the need for more efficient and adaptable solutions, FLNG terminals are poised to play a pivotal role in shaping the future of the global LNG market. As technology advances and costs decrease, FLNG presents a promising opportunity to meet the evolving needs of the energy industry.

capacity FLNG jump
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Port of Nigg’s owner passes the baton to Japanese investor

August 2, 2025

Nexans and Crowley Launch Jones Act Cable Lay Barge for U.S. Offshore Wind

August 2, 2025

Scotland greenlights mammoth offshore wind project

August 1, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025
Don't Miss
Oil & Gas

Petrobras opts to keep Constellation rig busy for 301 more days

December 28, 2024

Brazilian Drilling Contractor Constellation Oil Services Secures Contract Extension with Petrobras Constellation Oil Services, a…

Ship Recycling To Double With 16,000 Vessels Expected To Be Scrapped In Next Decade

June 27, 2025

Subsea7 Secures Contract Extension for Seven Viking Subsea Vessel

April 11, 2025

WaveX and Trident Energy unite for wave energy project in Western Australia

January 21, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Borr rig ends Gabon job with a bang: oil discovery opens new cluster door

March 7, 2025

Enforcement agencies thwart Russian stealing yacht

May 10, 2025

Enagás ready to provide bio-LNG to ships at Huelva and Barcelona terminals

February 22, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.