Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Oil & Gas»Serica facing stabilization setbacks after North Sea FPSO restart
Oil & Gas

Serica facing stabilization setbacks after North Sea FPSO restart

July 30, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Serica Energy Faces Production Delay in North Sea Cluster

The UK-based upstream oil and gas player Serica Energy is currently experiencing delays in normalizing production from its cluster in the North Sea. This production is facilitated through a floating production, storage, and offloading (FPSO) vessel operated by Dana Petroleum.

Despite restarting the FPSO Triton in July, the ramp-up to steady production has been slower than expected. Serica now anticipates reaching stable production levels in August.

The Triton cluster comprises eight producing oil fields, including Evelyn, Bittern, Guillemot West, Guillemot North West, Gannet E, Clapham, Pict, and Saxon.

Following a shutdown post-Storm Éowyn, production restart faced delays due to issues with the gas lift system in the Bittern field. This field, in which Serica holds a 64.6% interest, is crucial for providing gas lift and fuel gas for the FPSO.

CEO Chris Cox expressed frustration over the delays, emphasizing the potential for increased production once all Triton fields are back online.

Efforts are underway to bring the Evelyn and Gannet fields back online, including the introduction of new wells in Guillemot North West and Evelyn.

Despite setbacks, Serica remains optimistic about tying the BE01 well on the Belinda field into the Triton FPSO for production in early 2026.

While production guidance for 2025 has been revised downwards due to delays, Serica continues to focus on ramp-up efforts and portfolio expansion in the North Sea.

In addition to operational challenges, Serica recently completed the acquisition of Parkmead (E&P) Limited, adding two new licenses on the UK Continental Shelf.

See also  SOCAR strengthens energy ties in oil & gas realm with ExxonMobil and Canadian player

Collaborating with EnerMech for offshore shutdown support services, Serica is dedicated to overcoming obstacles and maximizing the potential of its North Sea assets.

facing FPSO North restart Sea Serica Setbacks stabilization
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

North Sea yields ‘significant’ black gold discovery

August 21, 2025

Strohm’s TCP jumpers make their way to Malaysian deepwater sector

August 21, 2025

Petrobras hands out $640M in ROV support vessel contracts to compatriot firm

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Port

Ports of Odesa and Chernomorsk Attacked as Russia Claims Military Targets

May 26, 2025

Russian Attacks Target Ukrainian Ports of Odesa and Chernomorsk During the recent wave of Russian…

Paper tigers at sea – Splash247

May 12, 2025

Anchoring system in place for solar integration with Dutch offshore wind

May 20, 2025

TotalEnergies, Vantage Drilling form drillship-owning entity

January 3, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Tourist sub sinks in Egypt, six feared dead

March 28, 2025

SGS Completes In-Water Thruster Install, Rudder Bushing Replacement

February 15, 2025

ABS Greenlights XXL Floating Wind Platform Design for Deepwater

February 28, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.