Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Alternative-Fueled Vessel Orders Continue Steady Upward Pace
  • NGOs Call for IMO Action on an Arctic HFO Ban
  • Nexans and Crowley Wind Services partner on US cable lay barge
  • Ukraine to explore floating solar with Norwegian-Turkish partners
  • FPSO destined for ExxonMobil’s Guyana project getting titanium reinforcements
  • Weeding Marine Debris Out of Flower Garden Banks National Marine Sanctuary
  • Kate Donadio joins IBEX as marketing director
  • Scotland Gives Go-Ahead for World’s Largest Offshore Wind Farm
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Keel laying marks official construction start of NKT’s second cable layer
Offshore

Keel laying marks official construction start of NKT’s second cable layer

January 17, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

NKT Marks Keel Laying of NKT Eleonora Cable-Laying Vessel

Danish power cable manufacturer and installation company NKT has marked the official start of construction of its new cable-laying vessel (CLV) NKT Eleonora with the keel laying ceremony, some two months after the first steel was cut for the vessel.

The official keel laying of NKT Eleonora took place on January 15 at one of VARD’s facilities in Romania.

The first steel for the vessel was cut at the beginning of November 2024.

“With NKT Eleonora, we are reinforcing our leading position in the global offshore cable market with unmatched installation capabilities. This ceremony symbolises our commitment to advancing offshore cable installation and investing in the energy infrastructure essential for the green transition,” said Darren Fennell, Executive Vice President and Head of HV Solutions in Karlskrona.

Investments for the Future

To remind, on the back of a record order backlog and strong market outlook, NKT announced investments in its second CLV, as well as in a new high-voltage factory on the existing site in Karlskrona, Sweden, in May 2023, with both assets expected operational from 2027.

Features of NKT Eleonora

NKT Eleonora will be able to run on both methanol and HVO/marine diesel oil and will feature Wärtsilä 32 methanol engines. Wärtsilä is also supplying the front tunnel and azimuth thruster, NOV REMACUT the cable lay system, cranes and mission equipment, and ABB will deliver its Onboard DC Grid power distribution system.

The 176.5-meter-long CLV was designed by Salt Ship Design. Equipped with three turntables, it will offer a cable-laying capacity of 23,000 tonnes.

See also  After maiden job in the Netherlands, China’s first subsea cable shuttle barge going to UK
cable Construction Keel layer laying Marks NKTs official Start
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Alternative-Fueled Vessel Orders Continue Steady Upward Pace

August 1, 2025

Nexans and Crowley Wind Services partner on US cable lay barge

August 1, 2025

Scotland Gives Go-Ahead for World’s Largest Offshore Wind Farm

August 1, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025
Don't Miss
Environment

SEA-LNG says IMO should remain fuel agnostic

March 13, 2025

Written by Marine Log Staff Image: IMO SEA-LNG Advocates for Multi-Pathway Future for Shipping SEA-LNG…

Russia Launches ‘Massive’ Missile-Drone Attacks On Ukraine’s Key Gas & Energy Facilities

January 15, 2025

New tidal turbine blade tech project links Wales and Galicia

July 15, 2025

China Leads the World in Energy Investment

June 10, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Australian LNG terminal gets green light to avert looming gas crisis

May 31, 2025

Sonardyne Integrates -4H-JENA Sensor into ADCP for Ocean Acidification Research

April 7, 2025

US Natural Gas Prices Fall 6% in Volatile Contract Expiration Trade

May 29, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.