Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Trump Halts All Offshore Wind Leasing, Orders Review of Existing Projects in Day One Executive Action
Offshore

Trump Halts All Offshore Wind Leasing, Orders Review of Existing Projects in Day One Executive Action

January 22, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

President Trump Halts Offshore Wind Development in Sweeping Executive Action

In a sweeping executive action on his first day in office, President Donald Trump has ordered an immediate halt to all offshore wind development on the U.S. Outer Continental Shelf and launched a comprehensive review of existing wind energy projects.

The presidential memorandum, which took effect January 21, 2025, implements a complete withdrawal of all OCS areas from wind energy leasing and will remain in force until revoked. While the order doesn’t affect existing lease rights, it mandates a thorough review of current wind energy leases for potential termination or amendment.

The action marks a dramatic shift from the previous administration’s ambitious offshore wind goals, which targeted 30 gigawatts of offshore wind capacity by 2030 and 15 gigawatts of floating offshore wind by 2035. The Biden administration had approved 11 commercial-scale offshore wind projects and conducted six lease auctions since 2022, including first-ever sales in the Pacific, Gulf of Mexico, and Gulf of Maine.

In addition, in April 2024, former U.S. Secretary of the Interior Deb Haaland announced a five-year offshore wind leasing schedule with up to 12 potential lease sales through 2028—four sales in 2024, one each in 2025 and 2026, two in 2027, and four in 2028.

Industry response to Trump’s action has been swift and critical. The American Clean Power Association’s CEO Jason Grumet stated, “ACP strongly opposes blanket measures to halt or impede development of domestic wind energy on federal lands and waters,” noting the contradiction between the administration’s stated goals of reducing bureaucracy while implementing new barriers to energy development.

See also  Prosafe offloads 20-year-old flotel for $5m

The impact on the U.S. maritime sector could be significant. The offshore wind industry had projected $65 billion in investments by 2030, supporting 56,000 jobs, with significant benefits for U.S. shipbuilding and maritime operations.

The memorandum also extends beyond offshore projects, implementing a broader moratorium on federal permitting for both onshore and offshore wind development pending a comprehensive environmental and economic review. This includes specific action on the Lava Ridge Wind Project, placing a temporary hold on all related activities.

This policy shift comes despite growing wind power adoption across political lines, with eight of the top ten states in wind power utilization being states that voted for Trump.

action Day executive existing Halts Leasing Offshore orders Projects Review Trump Wind
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Hanwha Ocean and Hyundai E&C form offshore wind partnership

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025
Don't Miss
Oil & Gas

‘Exciting’ marine phenomenon at offshore gas platform ignites spark of scientific research

July 17, 2025

Scientific Discovery at Offshore Gas Platform in Mediterranean Sea Sparks Research Collaboration CSA Ocean Sciences…

Police Looks Into Foreign Ship’s Role in Estonia-Finland Interconnector Outage

December 28, 2024

Rosatom Expects Boom In Foreign Vessels Using Arctic

May 30, 2025

KABELSCHLEPP Metool Enhances UNIFLEX Advanced Cable Carriers

July 29, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

NOIA Ready to Drive Offshore Energy with Trump Administration

January 21, 2025

Mandatory Turbine Upgrade Mandate Upsets Wind Industry

December 23, 2024

Solstad Offshore firms up $84m AHTS deal with Petrobras

July 13, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.