Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Van Oord’s Heavy Lift Vessel Installs First Monopile at Polish OW Farm
Offshore

Van Oord’s Heavy Lift Vessel Installs First Monopile at Polish OW Farm

February 7, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Van Oord’s Svanen Installs First Monopile at Baltic Power Offshore Wind Farm

The Baltic Power offshore wind farm, located north of the Polish coast, is making strides in renewable energy with the installation of its first monopile by Van Oord’s heavy lift installation vessel, Svanen. Developed by ORLEN and Northland Power, the wind farm project has contracted Van Oord for the transport and installation of 78 foundations, each comprising a monopile fitted with a transition piece.

Once completed, the Baltic Power offshore wind farm is set to have a production capacity of up to 1.2 GW, providing renewable energy to over 1.5 million households in Poland. The project is expected to be finalized by 2026.

New Generation Wind Turbines

The wind farm will feature the latest generation of wind turbines, boasting a generating capacity of 15 WM. To accommodate these larger turbines, the Svanen underwent a significant upgrade, including the extension of its gantry crane by 25 meters. This enhancement positions the Svanen as one of the largest heavy lift installation vessels globally, ready to install the foundations for the new generation of wind turbines.

With this upgrade, Van Oord is well-equipped to handle the evolving technology in wind farm construction, as turbines and foundations continue to increase in size to meet the rising global demand for renewable energy.

Van Oord’s commitment to sustainable energy solutions is evident in their involvement in projects like the Baltic Power offshore wind farm. By leveraging their expertise and cutting-edge equipment like the Svanen, they are contributing to the transition towards a cleaner and greener future.

See also  Equinor and Polenergia Secure €7.2 Billion Financing for Major Polish Offshore Wind Projects
Farm Heavy installs Lift Monopile Oords Polish Van Vessel
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Petrobras hands out $640M in ROV support vessel contracts to compatriot firm

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Oil & Gas

ConocoPhillips becomes sole operator of Malaysian offshore cluster

January 28, 2025

ConocoPhillips Takes Over Operatorship of Kebabangan Cluster PSC from Petronas Malaysia’s state-owned energy player Petronas…

India plans 4GW offshore wind energy tenders

June 17, 2025

US subsea firm’s ‘cornerstone product’ going to Gulf of America’s oil & gas operator

March 20, 2025

Steady growth propels DP World past 100 million TEUs handled

January 10, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Integrated Data System for Coral Reefs Enables AI Analysis

February 17, 2025

Podcast: Green technology and sustainable vessel designs

May 12, 2025

McDermott picks up Brazilian contract

July 7, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.