Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Eni, YPF Sign Agreement On Argentina LNG Project
  • Teledyne Valeport Water Announces Shallow Water Hyperion32
  • Second Bulker Refloated After Grounding off Sweden
  • bound4blue WAPS calculation method wins DNV nod of approval
  • NOAA: Operational Forecast System Informs Shipwreck Oil Spill Scenarios
  • Tourist boat carrying 89 passengers capsizes in Bali
  • Lithuania to relaunch 700MW offshore wind tender next week
  • UML ready to welcome first newbuild tanker fitted with WAPS
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Oil & Gas»‘World’s largest metamorphic buried hill oilfield’ comes online three years after discovery
Oil & Gas

‘World’s largest metamorphic buried hill oilfield’ comes online three years after discovery

February 9, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

China National Offshore Oil Corporation (CNOOC) Begins Production at Bozhong 26-6 Oilfield Project

Chinese state-owned oil and gas giant China National Offshore Oil Corporation (CNOOC) has tucked another milestone under its belt by switching the production mode on at an oilfield project in Bohai Bay, which is expected to boost its oil arsenal while taking advantage of carbon capture, utilization, and storage (CCUS) to enable low-carbon barrels and development in the region.

CNOOC, which operates the Bozhong 26-6 oilfield development project (Phase I) with 100% interest, has brought this project on stream, describing it as “the world’s largest metamorphic buried hill oilfield” with cumulative proven oil and gas in place of over 200 million cubic meters.

Located in central Bohai Bay, within an average water depth of approximately 20 meters, the project’s main production facilities encompass a new central processing platform and an unmanned wellhead platform. The oil property is said to be light crude.

The Bozhong 26-6 project is expected to reach a peak production of approximately 22,300 barrels of oil equivalent per day in 2025. To this end, 33 development wells are planned to be commissioned, including 22 production wells, 10 gas injection wells, and one water source well.

The Chinese giant claims that this project benefits from the application of standardized engineering; thus, it took only three years from the discovery of the oilfield for oil to start gushing out, realizing the rapid conversion of reserves to production.

Yan Hongtao, CNOOC’s President, highlighted: “The successful commencement of production of Bozhong 26-6 oilfield development project (Phase I) marks a new stage for the company in the development of offshore deep play complicated buried hill oil and gas reservoirs as well as the construction of the Bohai CCUS base.

“It bolsters the company’s energy supply capacity and low-carbon development in the Beijing-Tianjin-Hebei and Bohai Rim regions.”

Since the Bozhong 26-6 development is one of the firm’s CCUS demonstration projects in Bohai, it adopts advanced technology to capture and separate the associated carbon dioxide from crude oil extraction and reinject it back into the formation to drive the oil.

See also  ADNOC's $10B gas supply deal boosting UAE’s energy transition

The process is perceived to up the production ante while curbing carbon emissions. Thanks to the carbon capture technology, Bozhong 26-6 is expected to bury approximately 1.5 million tons of carbon dioxide throughout its life cycle.

CNOOC has earmarked up to $19 billion to ramp up its oil and gas production this year with the exploration and development of large and medium-sized oil and gas fields while harnessing more offshore wind and onshore solar, alongside other clean and low-emission developments, together with artificial intelligence (AI) to optimize its hydrocarbon business.

Multiple oil and gas discoveries were made last year. Many projects entered hydrocarbon production mode, including the firm’s latest gas project in the Yinggehai Basin off the coast of China, which came online last month.

buried discovery hill Largest metamorphic oilfield online Worlds years
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Partner selection quest for Alaska LNG tops $115B in interest from 50 firms

June 7, 2025

Transocean rig lines up more offshore drilling work in Norwegian waters

June 7, 2025

MODEC and UK firm going in hot pursuit of FPSO-based carbon capture tech

June 7, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Top 10 Biggest RORO Ships In The World

February 15, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

CMA CGM settles US sexual harassment case

January 11, 2025
Don't Miss
Port

U.S. Retail Imports Remained High Ahead of Tariffs but Maybe Slowing

February 8, 2025

U.S. Retail Imports Show Signs of Slowdown Amid Tariff Concerns According to the latest data…

Korean duo picks TMC Compressors for 32 ships set to work for ‘LNG shipping major’

January 10, 2025

Conservationists Sue BOEM to Restore OSV Speed Limits for Rice’s Whale

March 26, 2025

Terradepth Awarded 5-Year Contract For Offshore Energy Surveying

May 22, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Adani’s Mundra Port Welcomes Its First LNG Container Ship

December 28, 2024

Finish ETA 14-16 January, Ruyant loses headsail, icebergs sighted

January 3, 2025

Fugro Cuts Jobs and Scales Back US Operations

April 15, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.