Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Nexans and Crowley Wind Services to Develop and Operate Cable Lay Barge
  • Fugro secures UAE survey contracts
  • Eco Marine Power begins onboard trials of updated marine solar power system
  • Rig en route to OKEA’s North Sea tie-back project location ahead of drilling ops
  • PALFINGER MARINE to Showcase Crane Technologies at Aqua Nor
  • New Lock Opens Access for Larger Ships at North Sea Ports
  • Ferretti Group’s results steady as it looks to expand product offering
  • Port of Nigg’s owner passes the baton to Japanese investor
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Balmoral Comtec enters agreement for Korea’s 750 MW floating wind project
Offshore

Balmoral Comtec enters agreement for Korea’s 750 MW floating wind project

February 17, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Balmoral Comtec Signs MoU with LS Cable & System and LS Marine Solution for Floating Offshore Wind Collaboration

Balmoral Comtec, part of Balmoral Group, has signed a memorandum of understanding (MoU) with LS Cable & System and LS Marine Solution to collaborate in the floating offshore wind sector and on the 750 MW Bandibuli/Firefly project in South Korea.

The agreement with the Scotland-based buoyancy, protection, and insulation services provider follows LS Cable & System’s MoU with Equinor to cooperate on Bandibuli/Firefly, under which the dynamic subsea cable the Korean cable manufacturer developed is being considered for Equinor’s floating wind farm.

The Korea-based companies aim to collaborate with Balmoral Comtec through this new MoU to establish a secure and optimized operational system for floating offshore wind cables. Additionally, LS Marine Solution will enhance installation efficiency and ensure stable maintenance, supporting the successful execution of the project, Balmoral said on 17 February.

Bill Main, Managing Director of Balmoral Comtec, said: “This Memorandum of Understanding (MoU) highlights our ongoing commitment to the floating wind sector. We are delighted to collaborate with LS Cable & System and LS Marine Solution on the Bandibuli project. Balmoral Comtec is uniquely positioned to support the offshore wind industry, drawing on our decades of experience. By leveraging our innovative products and expertise, we aim to help accelerate the industry’s growth and meet its ambitious targets.”

The 750 MW floating wind farm is planned to be built 70 kilometers off the Ulsan coast across two sites, each covering 75 square kilometers.

See also  Rem Offshore scores PSV fixture

Equinor signed an MoU for the development of the Firefly/Bandibuli project with Ulsan City in May 2019 and received approval for the project’s Environmental Impact Assessment (EIA) in July 2024, allowing the wind farm to participate in the fixed-price contract auction for wind power projects.

In October 2024, the wind farm entered into a Transmission Service Agreement (TSA) with Korea Electric Power Corporation (KEPCO) and two months later, in December 2024, the 750 MW Firefly/Bandibuli was announced as one of the five offshore wind projects awarded capacity by South Korea’s Ministry of Trade, Industry, and Energy (MOTIE). Equinor’s project was also the only floating wind farm selected in the auction, the four other offshore wind farms being fixed-bottom.

The Firefly/Bandibuli floating wind farm will feature Siemens Gamesa 15 MW wind turbines, with plans to assemble the nacelles locally under an agreement Equinor signed with Siemens Gamesa in October 2024.

“Although floating offshore wind currently accounts for only about 1% of the market, it is expected to grow rapidly. Through the Bandibuli Project, we aim to secure core technologies and continue leading the market through ongoing technological advancements and global cooperation”, an LS Cable & System official said following the new MoU with Balmoral Comtec.

Agreement Balmoral Comtec enters Floating Koreas project Wind
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Nexans and Crowley Wind Services to Develop and Operate Cable Lay Barge

August 2, 2025

Fugro secures UAE survey contracts

August 2, 2025

Rig en route to OKEA’s North Sea tie-back project location ahead of drilling ops

August 2, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025
Don't Miss
Offshore

Tanjung Offshore wins services contract from Hibiscus Petroleum

January 11, 2025

Tanjung Offshore Secures Contract for PM3-CAA Oilfield Services Malaysian offshore services provider Tanjung Offshore, a…

ABS Sees Nuclear as ‘Generational Opportunity’ for US Shipbuilding

February 24, 2025

Massachusetts Offshore Wind Farm Postponed Four Years Due to Uncertainties

February 28, 2025

US offering 15,000 blocks in upcoming offshore lease sale

June 28, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Danish wave energy firm gears up for final PTO testing

March 27, 2025

Floating solar-powered system replaces diesel at salmon pen in Chile 

July 25, 2025

First US-Built Offshore Wind Installation Vessel Begins Sea Trials as Nation’s Largest Offshore Wind Project Hits Halfway Mark

February 5, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.