Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Asso.subsea scores cabling work for TenneT off Germany
Offshore

Asso.subsea scores cabling work for TenneT off Germany

July 30, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Greece-Based Asso.subsea Awarded Nearshore Cable Installation Scope for TenneT’s Offshore Projects

Greece-based offshore contractor Asso.subsea has been awarded the nearshore cable installation scope for TenneT’s three projects offshore Germany. The three projects are part of TenneT’s 2GW program and include BalWin4, LanWin1, and LanWin5, located off the northwestern coast of Baltrum Island.

This marks the beginning of a new collaboration between Asso.subsea and Jan De Nul, acting as the main contractor, with TenneT as the end client. Each project involves the transportation and nearshore installation of a complex cable bundle comprising two HVDC power cables, one metallic return cable, and one fiber optic cable.

Installation for BalWin4 is scheduled for 2027, while LanWin1 and LanWin5 installations will be completed in 2028 and 2029, respectively. The scope of work includes cable transpooling from load-out ports in the Netherlands or Germany, precision cable landing via beaching operations with spud cans, and cable free-lay in intertidal zones and wet storage of cable ends.

The installation operations will be carried out using the 2008-built CLV Atalanti, which will be specially modified to accommodate the four-cable bundle configuration.

See also  Prosafe offloads 20-year-old flotel for $5m
Asso.subsea cabling Germany scores TenneT Work
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Hanwha Ocean and Hyundai E&C form offshore wind partnership

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025
Don't Miss
Offshore

Modec to provide FPSO for Shell’s Gato do Mato project

March 25, 2025

Modec Signs FPSO Deal with Shell for Gato do Mato Project Modec, a leading floater…

Panama cracks down on STS transfers in bid to clean up fleet

August 8, 2025

Seventh FPSO prepares to join Petrobras’ Santos Basin field

July 1, 2025

Lloyd’s Register Secures In-Service Submarine Contract to Support UK MOD

July 17, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Changing nature of Protector Boats’ maritime models

August 17, 2025

Knutsen Group advances digital transformation with Marlink’s Sealink NextGen

February 28, 2025

Seaturns raises €2.45 million to launch full-scale wave energy demonstrator

July 7, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.