Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Carnegie advances ACHIEVE wave energy project with new EuropeWave payment
  • US energy giants poised to pour $60 billion into UAE oil & gas projects
  • Bot Catches an Underwater Wave, Jellyfish Next
  • India Plans to Issue Krill Fishing Permits for Antarctic Waters
  • Ship Recyclers Face Confusing Market Fundamentals
  • Satellite data from Ship Captures Landslide-Generated Tsunami
  • UAE Extends its Dominance in Egypt’s Port Sector
  • Guyana Passes Bill to Hold Offshore Operators Responsible for Oil Spills
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Knowledge»Biggest U.S Cable Laying Ship
Knowledge

Biggest U.S Cable Laying Ship

April 30, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The title of the biggest U.S. cable-laying ship goes to the CS Global Sentinel, designed for long-range, deep-sea cable laying and repairs for both government and commercial projects.


The ship was built by the Far East Shipbuilding Industries in Singapore and was launched on October 12, 1990.

It was completed in 1991 for Transoceanic Cable Ship Co. Inc., a subsidiary of AT&T, a U.S. telecommunications company.

The first voyage of the biggest U.S. cable layer was in February 1992. The ship sailed from the shipyard to Honolulu and began operations.

The ship was part of the company’s efforts to expand and modernise its fleet for the global telecommunications infrastructure.

CS Global Sentinel has a sister ship, the CS Global Mariner, which shares its specifications.

The biggest cable-laying ship of the U.S has an LOA of 145.66 m and a beam of 28 m. It has a deadweight tonnage of 8527 and a gross tonnage of 13,201.

It can accommodate up to 138 personnel and has an endurance of up to 60 days.

Its propulsion system includes a diesel-electric system with 3 Wartsila engines and 4 thrusters for precise manoeuvring.

The ship is also equipped with a remotely operated vehicle and a sea plow for cable laying and burial operations.

The biggest U.S cable-laying ship has been involved in several undersea cable installations in challenging environments. It is known for its advanced capabilities and a long service record.

You might also like to read-

See also  10 Biggest Ships with Sails
biggest cable laying Ship U.S
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Ship Recyclers Face Confusing Market Fundamentals

May 19, 2025

Satellite data from Ship Captures Landslide-Generated Tsunami

May 19, 2025

Mexican Navy Tall Ship Crashes Into Brooklyn Bridge, Killing 2

May 18, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

CMA CGM settles US sexual harassment case

January 11, 2025

Canadian Freighter ‘Tim S. Dool’ Hard Aground in St. Lawrence River

December 26, 2024
Don't Miss
Offshore

UK invests $71m in Scottish port to push floating wind development

March 9, 2025

The UK Government Invests $71m in Floating Wind Hub in Scotland The UK government has…

Prime Vendor Program Logistics Explained

February 27, 2025

Last Surviving Ship Of “Battle of the Atlantic” Gets £225,000 Grant To Secure Its Future

January 27, 2025

MOL joins international e-methane coalition

March 4, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

HJSC wins LR’s nod for 88,000 cbm VLAC design

December 31, 2024

Bureau Veritas joins European effort to advance liquid hydrogen fuel solutions in SOVs

April 30, 2025

Fugro’s Geophysical Survey Vessel Runs Aground off Italy

March 25, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.