Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Cable route construction starts on UK’s subsea green electricity superhighway
Offshore

Cable route construction starts on UK’s subsea green electricity superhighway

August 19, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Construction Underway for UK’s Largest Electricity Transmission Project

Construction has started on the cable route for Eastern Green Link 2 (EGL2), a subsea link said to be the UK’s largest-ever electricity transmission project and the longest high voltage direct current (HVDC) cable in the country.


Source: Balfour Beatty via LinkedIn

Developed by a joint venture of SSEN Transmission and National Grid Electricity Transmission, EGL2 involves the installation of a 505-kilometer, 2 GW HVDC subsea cable connecting Peterhead in Scotland to Drax in Yorkshire. Construction of the project started in September 2024.

UK-based infrastructure group Balfour Beatty, which is in charge of installing the HVDC land cables in both Scotland and England, reported yesterday, August 18, that construction on EGL2’s cable route had officially commenced.

The total cost of the link is estimated at approximately €5 billion, with a portion to be financed by a €800 million loan facility from Swedish Export Credit Corporation (SEK), a state-owned company that finances Swedish exporters, their subcontractors, and foreign customers.

Project completion is expected in 2029. Once operational, EGL2 will transport renewable electricity capable of powering around two million homes.

Power Your Brand With Offshore Energy

Take the spotlight and anchor your brand in the heart of the offshore world!

Join us for bigger impact and amplify your presence in the heart of the offshore energy community!

See also  EPA Halts Atlantic Shores Wind Farm Construction as Trump Administration Reviews Projects
cable Construction Electricity Green Route Starts Subsea superhighway UKs
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

European refiners could drive green hydrogen momentum, with maritime sector playing important role

August 21, 2025

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Top 16 Biggest LNG Ships

April 16, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025
Don't Miss
Energy

Grimaldi pours $1.3 billion into new methanol-ready Ro-Pax fleet

April 9, 2025

Grimaldi Orders $1.3 Billion Methanol-Ready Ro-Pax Vessels from Chinese Shipyard Italian shipping group Grimaldi has…

Port Canaveral Plans $500 Million Investment to Upgrade Operations

May 2, 2025

MTF: Key recommendations put on the table for shipping industry to accelerate OCCS adoption

January 23, 2025

TotalEnergies begins drilling first of two planned oil prospects offshore Namibia

February 6, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Monna Lisa Cable Layer Joins Prysmian’s Fleet

February 6, 2025

Eco Marine Power begins onboard trials of updated marine solar power system

August 2, 2025

Construction starts on ‘world’s first eCSOV’

July 22, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.