Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Eni, YPF Sign Agreement On Argentina LNG Project
  • Teledyne Valeport Water Announces Shallow Water Hyperion32
  • Second Bulker Refloated After Grounding off Sweden
  • bound4blue WAPS calculation method wins DNV nod of approval
  • NOAA: Operational Forecast System Informs Shipwreck Oil Spill Scenarios
  • Tourist boat carrying 89 passengers capsizes in Bali
  • Lithuania to relaunch 700MW offshore wind tender next week
  • UML ready to welcome first newbuild tanker fitted with WAPS
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Oil & Gas»Construction begins on FSO bound for Vietnam’s oil field
Oil & Gas

Construction begins on FSO bound for Vietnam’s oil field

February 25, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Yinson Production Holds Steel-Cutting Ceremony for FSO Unit Bound for Vietnam

Yinson Production, a subsidiary of Kuala Lumpur-based energy infrastructure and technology company Yinson Holdings, recently celebrated a significant milestone with the steel-cutting ceremony for a floating storage and offloading (FSO) unit destined for the Lac Da Vang oil field offshore Vietnam.

The ceremony, which took place on February 22, 2025, at Nantong Strongwind Shipyard in Tongzhou Bay, China, marked a crucial step towards enhancing Vietnam’s energy security, according to Yinson.

Key stakeholders from PTSC Asia Pacific, Murphy Cuu Long Bac Oil Company, Nantong Municipal Government, Titan Wind Offshore, and ABS were present at the event.

The FSO unit, designed for low-carbon operations and capable of storing up to 500,000 barrels, is scheduled to commence operations by Q4 2026. The project, constructed by OceanSTAR Elite Group, incorporates state-of-the-art technologies to optimize energy circulation and reduce operational costs.

In December 2024, a contract for the provision, charter, operation, and maintenance of the FSO was awarded to PTSC Asia Pacific, a joint venture between Yinson Production and PetroVietnam Technical Services Corporation (PTSC).

Murphy Oil operates Block 15-1/05 in the Cuu Long Basin with a 40% working interest, while partners PetroVietnam Exploration Production and SK Earthon hold the remaining 35% and 25%, respectively.

The Lac Da Vang field is estimated to have 100 million barrels of oil equivalent (mmboe) gross resources, with peak gross production forecasted at 30 to 40 mboepd and net peak production at 10–15 mboepd.

Delivery of the FSO is anticipated to align with Murphy’s first oil timeline for 2026, with development phases extending through 2029.

See also  Baker Hughes’ tech to enhance oil & gas production across Petrobras’ deepwater fields

In a recent discovery at the Hai Su Vang field in the Cuu Long Basin, Murphy encountered around 112 meters of net oil pay in two reservoirs through the Hai Su Vang-1X exploration well.

Begins Bound Construction Field FSO Oil Vietnams
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

NOAA: Operational Forecast System Informs Shipwreck Oil Spill Scenarios

June 8, 2025

Partner selection quest for Alaska LNG tops $115B in interest from 50 firms

June 7, 2025

Supertanker Disconnects from Pipeline in Storm Causing Oil Slick

June 7, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Top 10 Biggest RORO Ships In The World

February 15, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

CMA CGM settles US sexual harassment case

January 11, 2025
Don't Miss
Energy

HD Hyundai Mipo: Construction begins on ‘world’s first’ oceangoing ammonia-powered vessel

January 8, 2025

HD Hyundai Mipo Cuts Steel for Ammonia-Powered LPG Carrier South Korean shipbuilder HD Hyundai Mipo…

Van Oord awards Ecowende cable termination and testing contract

March 26, 2025

Deep Strike: Seabed Warfare Will Target More Than Cables and Pipelines

June 6, 2025

NOV secures Energean FPSO work

May 27, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Google Signs Power Agreement with Shell Extending Life of Dutch Wind Farm

May 6, 2025

Nationwide Strike Paralyzes Belgium’s Ports, Airports, and Services

March 31, 2025

More Norwegian gas for Europe as first segment of two-phase development comes online

March 17, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.