Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Export cable installation to start at East Anglia Three offshore wind farm
Offshore

Export cable installation to start at East Anglia Three offshore wind farm

June 7, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

NKT Victoria to Install Export Cable for East Anglia Three Offshore Wind Farm

NKT, using its vessel NKT Victoria, is scheduled to start installing the export cable for the 1.4 GW East Anglia Three offshore wind farm in the UK this month.

The vessel is expected to mobilize from the port of Karlskrona in Sweden on June 14 and work on the East Anglia Three site 24/7, conducting simultaneous laying and burial of the cables, according to a Notice to Mariners from the project.

Offshore construction on ScottishPower Renewables’ East Anglia Three, located 69 kilometers off the coast of Norfolk, began this spring with the installation of monopiles.

NKT is supplying and installing the export cable for the project under a turnkey contract that the cable manufacturer secured in 2022.

In 2023, the company received a firm order from ScottishPower Renewables to design, manufacture, and install the complete 320 kV HVDC export power cable system for the offshore wind farm.

East Anglia Three is the second of ScottishPower Renewables’ East Anglia projects to be developed and part of the East Anglia Hub, which includes two other offshore wind farms: the 800 MW East Anglia One North and the 900 MW East Anglia Two.

The 1.4 GW offshore wind farm will comprise 95 Siemens Gamesa 14+ MW wind turbines, all of which are expected to be operational in 2026.

See also  Proposed New Jersey Offshore Wind Farm Seeks to Cancel Regulatory Licenses
Anglia cable East Export Farm Installation Offshore Start Wind
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Hanwha Ocean and Hyundai E&C form offshore wind partnership

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

Top 16 Biggest LNG Ships

April 16, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025
Don't Miss
Energy

LNG-fueled Triton Highway delivered to K Line

April 12, 2025

Japanese Shipping Company K Line Welcomes New LNG-Fueled Car Carrier Japanese shipping company Kawasaki Kisen…

UK Proposes New Port Reforms to Aid Development and Investment

June 7, 2025

Dredging for cyanide underway in toxic Walsall Canal

April 7, 2025

HD Hyundai hosts US-Korea MASGA shipbuilding cooperation talks

August 16, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Europe’s Seafood Farmers Get Boost from AI Research

January 21, 2025

ASRY, AtkinsRéalis Sign MoU on Offshore Wind Energy Projects

April 25, 2025

MARAD Receives Proposal for Floating Offshore LNG Export Terminal off Texas

July 4, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.