Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Exxon Consortium to Begin Installation of Floating Oil Facility in Guyana
Offshore

Exxon Consortium to Begin Installation of Floating Oil Facility in Guyana

April 16, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Exxon Mobil to Install Fourth Floating Oil Production Facility in Guyana

A consortium led by U.S. Exxon Mobil is gearing up to install its fourth floating oil production facility in Guyana, as confirmed by the country’s maritime regulator in a recent notice. The floating production storage and offloading (FPSO) facility, named ‘One Guyana,’ was constructed by SBM Offshore and has a capacity of 250,000 barrels per day. Departing from Singapore in mid-February, the vessel is set to significantly enhance the consortium’s output capacity to approximately 940,000 bpd by the end of this year.

In 2024, the group achieved an average production of 616,000 bpd following upgrades at two of its three operational facilities. With the imminent arrival of two more vessels in Guyana over the next two years, the consortium is poised to further strengthen its presence in the region.

The installation of ‘One Guyana’ will enable the Exxon-led consortium, which holds exclusive control over all production activities in Guyana, to exploit the potential of the Yellowtail and Redtail fields within its extensive Stabroek block. This block has yielded over 11 billion barrels of recoverable oil and gas resources, making it a crucial asset for the consortium’s operations.

While Exxon Mobil has not yet responded to requests for comments, the maritime regulator has confirmed that the installation process is on track to be completed by the end of the year. This development marks a significant milestone in Exxon’s ongoing efforts to maximize oil production in Guyana.

For more information on Exxon’s latest floating oil production facility in Guyana, you can access the full story here.

See also  ABS, Akselos Sign Floating Wind MOU

(Source: Reuters)

consortium Exxon facility Floating Guyana Installation Oil
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025
Don't Miss
Offshore

ExxonMobil Finds New Gas Deposit Off Cyprus

July 10, 2025

ExxonMobil and Qatar Energy Make Significant Gas Discovery off Cyprus ExxonMobil and Qatar Energy have…

Sanctions and Oil Price Pressures Build on Russian Revenues

August 6, 2025

Oceaneering picks up subsea IMR and installation job for vessel in Gulf of Mexico

June 14, 2025

Perenco’s drilling ops in Caribbean unlock more gas

May 15, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Norway Launches Floating Offshore Wind Tender

May 19, 2025

Geotechnical survey coming up at Dogger Bank D offshore wind site

June 25, 2025

BOEM Extends Public Comment Period on Minerals Lease Sale

July 16, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.