Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Gulf of Mexico’s Newest Offshore Giant Goes Live
Offshore

Gulf of Mexico’s Newest Offshore Giant Goes Live

January 10, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Shell Announces Successful Startup of New Floating Production Facility, Whale

Shell has announced the successful startup of its newest floating production facility, Whale, in the deepwater Gulf of Mexico, marking a significant advancement in offshore energy production.

The state-of-the-art facility, located in the Alaminos Canyon Block 773, is situated approximately 200 miles south of Houston and operating in more than 8,600 feet of water depth.

The Whale development represents a major achievement in deepwater engineering. Discovered in 2017, the Whale field features a semi-submersible production platform at a depth of more than 8,600 feet (2,600 meters), connecting 15 wells to the host through subsea infrastructure.

“Whale demonstrates our focus on driving more value with less emissions from our Upstream business as we deliver the energy people need today,” said Zoë Yujnovich, Shell’s Integrated Gas and Upstream Director.

The facility is expected to reach a peak production of 100,000 barrels of oil equivalent per day, with recoverable resources estimated at 480 million boe. What sets Whale apart is its innovative design approach, replicating 99% of the hull design and 80% of the topsides from the successful Vito platform, a four-column semi-submersible host facility in the greater Mars Corridor.

In a notable achievement for offshore development efficiency, Whale reached first oil just 7.5 years after its 2017 discovery, despite facing a one-year delay due to COVID-related cash preservation measures.

The project showcases significant environmental improvements, featuring energy-efficient gas turbines and compression systems that result in approximately 30% lower greenhouse gas intensity over its lifecycle compared to the Vito facility. The advancement aligns with Shell’s position as the leading operator in the U.S. Gulf of Mexico, where their oil production maintains one of the lowest GHG intensities globally.

See also  NYK Group’s N-O-G Buys its First SOV From Edda Wind

The development is a joint venture between Shell Offshore Inc., holding a 60% operating interest, and Chevron U.S.A. Inc., which owns the remaining 40%.

Giant Gulf live Mexicos Newest Offshore
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Hanwha Ocean and Hyundai E&C form offshore wind partnership

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Top 16 Biggest LNG Ships

April 16, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025
Don't Miss
Offshore

Trump Administration Lifts Stop Work Order on $5B Empire Wind Project

May 20, 2025

The Empire Wind Project: Resuming Construction After a Brief Halt The Department of the Interior’s…

Sumitomo and Van Oord booked for second Shetland HVDC cable link

January 22, 2025

Scotland eyes almost $10B marine energy boost by 2050

February 14, 2025

PolyU leverages AI and big data to advance maritime safety and management

May 16, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Johan Inden to take helm in September 2025

May 13, 2025

ABS Approves First of Its Kind LCO2 Barge for U.S. Operation

May 24, 2025

New Report Emphasizes Dangers of Plastic Pollution, Announces Global Monitoring System

August 11, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.