Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Hollandse Kust West Beta cable tests completed
Offshore

Hollandse Kust West Beta cable tests completed

August 21, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The Site Acceptance Tests Completed for Hollandse Kust West Beta Cables

The Site Acceptance Tests (SAT) for the Hollandse Kust West Beta cables have been completed in the Dutch North Sea. The substation will connect the OranjeWind offshore wind farm, developed by RWE and TotalEnergies, to the onshore electricity grid.


Source: TenneT; Credit: Flying Focus

The testing of two 220 kV export cable systems for power transmission to shore, as well as one 66 kV interconnector cable between Hollandse Kust West Alpha and Hollandse Kust West Beta, was completed in one week. The two substations will connect the wind farms from the Hollandse Kust West area in the North Sea to the grid on land.

In May 2025, the Hollandse Kust West Beta substation platform was installed at the site approximately 50 kilometers off the coast of Egmond aan Zee.

The Smulders-Equans joint venture was responsible for the delivery of the substation platform and the jacket foundation.

The two 65-kilometer-long 220 kV export cables and a 9-kilometer-long 66 kV interconnector cable were supplied and installed by Boskalis and Orient Cable under a contract signed with Dutch/German transmission system operator (TSO) TenneT in 2022.

The OranjeWind offshore wind farm, located around 53 kilometers off the coast of IJmuiden, will comprise 53 Vestas V236-15.0 MW wind turbines. 

The project will have an installed capacity of 795 MW and a grid connection capacity of 760 MW. The additional 35 MW is reserved to optimize connection efficiency, even when production is lower.

See also  Tekmar Scoops $6.2M Offshore Wind Cable Protection Contract
Beta cable completed Hollandse Kust Tests West
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Hanwha Ocean and Hyundai E&C form offshore wind partnership

August 21, 2025

OceanPact scores $582m worth of vessel deals with Petrobras

August 20, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025
Don't Miss
Oil & Gas

Australian LNG terminal gets green light to avert looming gas crisis

May 31, 2025

Australian Energy Infrastructure Player Viva Energy Receives Environmental Permit for LNG Terminal Project in Geelong…

Turkey’s TPAO buys drillship pair from Eldorado Drilling

July 13, 2025

DSIC starts building Wah Kwong’s 175,000 cbm LNG vessel

March 6, 2025

MacArtney Group Celebrates a Year of Growth, Innovation, and Momentum

February 5, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

EasyPost introduces AI-powered automation tool Luma for shipping industry

February 12, 2025

Celsius and Basalt’s two-vessel LNG fleet growing by one, possibly more

February 10, 2025

Green Marine UK Looks to Support UK’s Subsea Power and Communications Network

May 8, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.