Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Hull for Japan-bound hybrid cable lay & construction vessel coming together in Romania (Video)
Offshore

Hull for Japan-bound hybrid cable lay & construction vessel coming together in Romania (Video)

March 12, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

The Arrival of Aft Part for Customized Hybrid Power Cable Lay Vessel at VARD Shipyard

The aft part of the highly customized hybrid power cable lay and construction vessel that VARD is building for the Japanese offshore wind market has arrived at the company’s Tulcea shipyard where it will be joined with the forward parts of the hull.

The Norwegian ship designer and shipbuilder held the keel laying ceremony in September 2024 for the vessel it is building for Toyo Construction, a Japanese general construction company that operates civil and architecture construction businesses.

On February 28, the aft part of NB 980 was launched and delivered from VARD Shipyards Romania – Braila and towed to Tulcea where it arrived on March 2. Preparation is currently underway to join the aft part with the blocks built in Tulcea, planned by the end of March.

The vessel is scheduled to be launched in Tulcea during the summer and works will continue at the yard until finalization in Norway.

VARD said this was the first time it was building a vessel at two hull yards.

“I would like to express my sincere gratitude for the successful launch of the hull’s aft section at Braila. While our work here in Braila is concluding, operations will continue in Tulcea until the launch and transit to Norway,” said Toyo’s Project Manager Takashi Enomoto.

Toyo Construction and Mitsui O.S.K Lines (MOL) established a joint venture focusing on offshore wind power generation in the summer of 2023, through which they want to create stronger synergies in a wide range of areas related to offshore wind.

See also  N-Sea lands another cable repair contract for 576 MW Gwynt y Môr offshore wind farm

According to VARD, the vessel will have an optimal hull design to suit the natural and construction conditions in Japan, allowing it to be used in both shallow waters and deep waters for floating offshore wind power generation and DC power transmission projects.

Vard Electro is delivering SeaQ equipment and solutions, with Vard Interiors delivering modern interior solutions and green HVAC R system. Huisman will deliver a full electric 250mt hybrid boom subsea crane and a 100mt knuckle boom crane.

The self-propelled cable-laying vessel will be powered by five main gensets and two batteries and will have a carrying capacity of 9,000 tons. It will have a maximum transit speed of 13 knots and will comprise 90 single cabins for 90 persons on board.

The vessel is scheduled for completion by Q2 2026.

cable coming Construction hull hybrid Japanbound lay Romania Vessel Video
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Petrobras hands out $640M in ROV support vessel contracts to compatriot firm

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Technology

Hanwha Ocean secures AIP for cybersecurity solution for FPSO units

July 1, 2025

The cybersecurity initiative is part of a multi-year technology collaboration agreement between ABS and Hanwha…

Construction of Carisbrooke Shipping’s next-gen diesel-electric vessel begins at Dutch shipyard

May 23, 2025

MOL and partners get green light for large ammonia-powered ammonia carrier design

March 16, 2025

Vision to action: Accelerating industrial digitalization and intelligence

March 13, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Electric boat championship will race in Croatia this summer

April 17, 2025

Kongsberg Maritime Unveils New Mooring Installation Solution for OSVCs

February 13, 2025

HGK Shipping, Covestro to install wind propulsion tech on Amadeus Titanium

July 10, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.