Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Technology»KOTUG Completes SPM Buoy Upgrade for Azule Energy
Technology

KOTUG Completes SPM Buoy Upgrade for Azule Energy

March 2, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

KOTUG Completes Bogie Wheel Replacement on Azule Energy’s CALM Buoy in Angola

KOTUG recently accomplished the replacement of the bogie wheel and rail system on Azule Energy’s Single Point Mooring (SPM) CALM buoy located in Angola’s Block 18. This particular buoy, one of the largest globally, was initially installed in 2007 at a depth of around 1,200 meters. It serves as the primary export route for oil from the Greater Plutonio FPSO.

The main goal of the project was to carry out the replacement work without causing disruptions to the ongoing oil production and export operations. To achieve this objective, KOTUG‘s team conducted a thorough site survey, managed engineering and procurement tasks, and devised detailed procedures to ensure the safe and high-quality execution of the project within the limited timeframe available between tanker calls at the SPM.

In October 2024, a dedicated team of 31 individuals from KOTUG worked tirelessly around the clock to complete the task safely, finishing 7 hours ahead of the planned schedule despite the CALM buoy being handed over 15 hours later than anticipated. The operation, which ran for 24 hours, involved transfers between the DP2 Offshore Support Vessel and the CALM buoy during nighttime hours—a task that is not commonly encountered in the field.

See also  Dutch province backs tidal energy expansion to add to Wadden Islands’ energy independence
Azule Buoy Completes Energy KOTUG SPM Upgrade
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification

August 21, 2025

Antarctica Undergoing Abrupt Change

August 21, 2025

Reach Subsea Completes Inspection for TotalEnergies Using USV/ Electric ROV

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Technology

Strohm, UNITECH Unite for Enhanced Subsea Pipeline Solutions

February 19, 2025

Revolutionizing Subsea Transportation: Strohm and UNITECH Offshore Collaborate on Integrated System Thermoplastic composite pipe (TCP)…

Statkraft and Clydeport agree to explore green hydrogen project at Hunterston PARC

June 1, 2025

Philippines Says Chinese Sea Gliders Were Used for Covert Mapping

April 16, 2025

Woodside to run North West Shelf LNG Plant to 2070

May 28, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

PSC signed for Myanmar’s seventh offshore project

June 2, 2025

Guyana Passes Landmark Law Making Companies Liable For Oil Spill Damages

May 21, 2025

Kystdesign to Deliver Advanced ROV to Dutch NIOZ

January 31, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.