Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Oil & Gas»MODEC delivers another piece of puzzle for Guyana-bound FPSO
Oil & Gas

MODEC delivers another piece of puzzle for Guyana-bound FPSO

July 26, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Japan’s MODEC Delivers Topsides Modules for FPSO Errea Wittu to ExxonMobil’s Guyana Project

Japan’s MODEC has successfully delivered the topsides modules that will be a part of the floating production storage and offloading (FPSO) unit, named Errea Wittu, to be deployed in a project offshore Guyana operated by ExxonMobil, a U.S.-headquartered oil and gas giant.

The topsides modules arrived at the BOMESC yard in Tianjin, China, as reported by the Japanese player, and were delivered on or ahead of schedule. All pre-commissioning and leak testing have been completed with no carry-over work remaining.

Expressing gratitude, MODEC’s Project Manager Joseph (Yossi) Azran-Alemberg commended the team for their hard work and dedication, setting a new standard in the industry. He emphasized the team’s unwavering commitment to safety and quality as key elements of their success.


Source: MODEC

The FPSO Errea Wittu, meaning “abundance,” will be MODEC’s first deployment in Guyana, servicing the Snoek, Mako, and Uaru fields in the Stabroek block. The vessel’s delivery to ExxonMobil is expected in 2026, coinciding with the first oil production.

Once installed approximately 200 kilometers offshore Guyana at a water depth of 1,690 meters, the FPSO will have the capacity to produce around 250,000 barrels of oil per day, treat 540 million cubic feet per day of associated gas, and store up to 2 million barrels of crude oil.

Key milestones for the FPSO Errea Wittu include the hull sailaway ceremony and arrival in Singapore in June, hull block assembly in October 2024, and the keel-laying ceremony held five months prior.

ExxonMobil Guyana, holding a 45% interest in the Stabroek block, partners with Hess Guyana Exploration LTD (30%) and CNOOC Petroleum Guyana Limited (25%). The final investment decision (FID) for the Uaru field was made in April 2023.

See also  Shell’s new North Sea FPSO brings UK’s oil & gas field back online

Delivers FPSO Guyanabound Modec piece puzzle
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

North Sea yields ‘significant’ black gold discovery

August 21, 2025

Strohm’s TCP jumpers make their way to Malaysian deepwater sector

August 21, 2025

Petrobras hands out $640M in ROV support vessel contracts to compatriot firm

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025
Don't Miss
Port

Iran Still Battling Port Fire As Death Toll, Casualties Rise

April 28, 2025

Tragedy Strikes Iranian Port: 40 Dead, 1,200 Injured By Arsalan Shahla Apr 27, 2025 (Bloomberg)…

Hull for Japan-bound hybrid cable lay & construction vessel coming together in Romania (Video)

March 12, 2025

Taiwan’s Dong Fang Offshore enters European market with DeepOcean charter deal

January 9, 2025

Shell Shuts Down Oil Processing Unit in Singapore Due to Suspected Leak

December 28, 2024

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Ocean Winds secures license for 1,125MW Korean offshore wind project

March 11, 2025

World’s First Methanol-Powered Container Ship

March 31, 2025

Icebreaker Construction: Seaspan, Bollinger, Rauma and Aker Arctic Team to Build USCG Icebreakers

July 30, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.