Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • European refiners could drive green hydrogen momentum, with maritime sector playing important role
  • North Sea yields ‘significant’ black gold discovery
  • Falmouth Scientific, Inc. Receives ISO 9001:2015 Quality Certification
  • New leadership for Oceanbird – Splash247
  • Boats Group lawsuit alleges monopoly in US listings
  • Hollandse Kust West Beta cable tests completed
  • New Fred. Olsen 1848 floating solar lead brings experience from SolarDuck, Equinor
  • Strohm’s TCP jumpers make their way to Malaysian deepwater sector
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Monna Lisa joins Leonardo da Vinci in Prysmian’s fleet (Video)
Offshore

Monna Lisa joins Leonardo da Vinci in Prysmian’s fleet (Video)

February 7, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

Prysmian’s Monna Lisa Cable Laying Vessel Joins Fleet

Prysmian’s new cable laying vessel (CLV) Monna Lisa has joined the fleet of the Italian cabling giant, following the completion of its sea trials.

The keel-laying ceremony for the CLV, a sister vessel to Leonardo da Vinci, was held in Tulcea, Romania, in April 2023 to mark the start of construction, which took around 24 months.

VARD launched the 171-meter vessel at the beginning of June 2024, after completing steel cutting, keel laying, generator installation, and hull erection.

Monna Lisa then began its journey of 4,000 nautical miles from Romania to Norway, towed down the Danube River, across the Mediterranean Sea, and up the coast of Portugal and Spain to VARD’s shipyard in Søvik to undertake final fit-out and trials.

Prysmian reported today, February 6, that the vessel had joined its fleet and is set to soon begin its operations.

The cable layer’s maiden assignment will be on the $5 billion Eastern Green Link 2 (EGL2) project, a joint venture between SSEN Transmission and National Grid, said to be the longest HVDC cable connection ever built in Great Britain.

The vessel will match Leonardo da Vinci for capacity and performance and will boast two carousels of 7,000 and 10,000 tons, the highest capacity in the current market. It will incorporate some green improvements such as lower CO2 emissions thanks to the high-voltage shore connection to power the vessel with clean energy during loading operation, a 3 MWh energy storage system with double the battery capacity and diesel generators ready for biodiesel blends.

See also  Wireless EV charging provider InductEV joins Zero Emissions Port Alliance

The addition of Monna Lisa will expand Prysmian’s installation fleet to six cable-laying vessels. It is the first item on Prysmian’s New Build Program after Leonardo da Vinci, but not the last one as Prysmian will expand its CLV fleet with two additional vessels.

VARD is currently building its third cable-laying vessel for Prysmian.

fleet joins Leonardo Lisa Monna Prysmians Video Vinci
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Hollandse Kust West Beta cable tests completed

August 21, 2025

DOF scores $165m SCV contract with Petrobras

August 21, 2025

Hanwha Ocean and Hyundai E&C form offshore wind partnership

August 21, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Maritime

Work begins on Bali Benoa Marina in Indonesia

July 2, 2025

PT Marina Development Indonesia (MDI), in collaboration with PT Pelabuhan Indonesia (Pelindo), officially broke ground…

NKT Partners Up with Helix for ‘World’s Most Powerful’ Subsea Trencher

July 19, 2025

Montreal Port Authority’s Julie Gascon on Tariffs & Trade

March 7, 2025

Record Year for Alternative-Fueled Vessel Order with LNG at Forefront, DNV Finds

January 10, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Enagás ready to provide bio-LNG to ships at Huelva and Barcelona terminals

February 22, 2025

Alaska’s LNG terminal shaking off years-long stasis with revamp to stave off gas shortages

February 7, 2025

Offshore solar farm ready for tow out to Hollandse Kust Noord wind farm

June 27, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.