Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Shipping’s first centrifugal carbon capture system installed on a Scorpio tanker
  • BEML and HSL sign MoU to develop advanced marine systems
  • Allseas-Boskalis Consortium Bags $1.4B Offshore Gas Pipeline Job in Taiwan
  • Philippines and Cosmoship Call for Release of Crew After Houthi Video
  • Fred Olsen Windcarrier lands German wind farm deal
  • China Stake in CK Hutchison Port Sale Could Ease Beijing Pressure but US Geopolitical Risks Remain
  • JMU hands over new energy-efficient 160,000 dwt Suezmax tanker
  • Noble’s rigs and Kongsberg Maritime’s tech opening doors to drilling innovation
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»New research project looking to minimize failure and repair costs of floating wind dynamic cables, mooring lines
Offshore

New research project looking to minimize failure and repair costs of floating wind dynamic cables, mooring lines

July 26, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

New UK Project Aims to Improve Mooring Lines and Dynamic Cables on Floating Offshore Wind Farms

A new project has been launched in the UK to improve the effectiveness of mooring lines and dynamic cables on floating offshore wind farms. Historically, mooring repair costs for oil production assets have exceeded GBP 400 million (approximately $542 million; €461 million) for a single incident, while cable failures have accounted for between 70% and 80% of UK offshore wind insurance claims, according to the Offshore Renewable Energy (ORE) Catapult, which commissioned the new project.

The Mooring Line and Dynamic Cable Monitoring and Replacement Methodologies project will be delivered by ORE Catapult’s Floating Offshore Wind Centre of Excellence, Apollo Engineering, and DOF Subsea UK.

ORE Catapult says that the floating wind industry needs a stronger understanding of component failure modes, the time and cost of repairs, and their impact on operational expenses, to successfully transition to commercialization.

“Operating and maintaining a floating offshore wind farm creates challenges not previously faced in fixed offshore wind, including the monitoring and replacement of mooring lines and dynamic cables“, said Sean Snee, Floating Offshore Wind Team Leader at ORE Catapult.

“More data is required to accurately assess key component failures and what leads to them. In identifying preventative measures and innovative technologies, the learnings from this project could reduce the overall cost of floating offshore wind mooring line and dynamic cable repairs and replacement across the UK and internationally.”

ORE Catapult launched the Floating Offshore Wind Centre of Excellence in 2019, with the aim of developing an internationally recognized centre of excellence that will work to reduce the cost of energy from floating wind, accelerate the build-out of floating wind farms, create opportunities for the UK supply chain, and drive innovations in manufacturing, installation, and operations and maintenance.

See also  INEOS Set for May Launch of First European Built CO2 Carrier

Cables Costs dynamic Failure Floating Lines minimize Mooring project repair Research Wind
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Allseas-Boskalis Consortium Bags $1.4B Offshore Gas Pipeline Job in Taiwan

July 29, 2025

Fred Olsen Windcarrier lands German wind farm deal

July 29, 2025

Is EU Spending $250B-per-year Spending on US Energy Realistic?

July 29, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025
Don't Miss
Technology

Novielli Boats, a prominent name in rib boat manufacturing, unveils its planned production facility.

February 7, 2025

Novielli Boats: Setting Sail Towards Innovation Novielli Boats has cemented its position as a leader…

Allman Named CEO At Fincantieri Marinette Marine

March 7, 2025

Major European Ports Face Headwinds in Q1 as Global Trade Tensions Rise

April 24, 2025

US Offshore Wind Projects Slow

April 7, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Keel laid for Indonesia’s first FLNG unit

February 25, 2025

Delfin Secures Key Permits for First Offshore LNG Export project in US

April 11, 2025

HyOrc, Start Lda to develop green methanol plant in Porto

July 9, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.