Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • Second Bulker Refloated After Grounding off Sweden
  • bound4blue WAPS calculation method wins DNV nod of approval
  • NOAA: Operational Forecast System Informs Shipwreck Oil Spill Scenarios
  • Tourist boat carrying 89 passengers capsizes in Bali
  • Lithuania to relaunch 700MW offshore wind tender next week
  • UML ready to welcome first newbuild tanker fitted with WAPS
  • Mother Ship with USV Flotilla Could Boost Coast Guard Capabilities
  • New Zealand To Ban Substandard Ships From Entering Its Ports
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Offshore»Plan Announced for Greece’s First Offshore Wind Farm
Offshore

Plan Announced for Greece’s First Offshore Wind Farm

January 28, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

New Partnership Announces Plans for First Offshore Wind Farm in Greece

A new partnership between two leading Greek companies has unveiled plans for the first offshore wind farm in Greece. This partnership, formed between Terna Energy and Greek conglomerate Motor Oil, marks a significant step in Greece’s renewable energy sector.

Terna Energy, with over two decades of experience in the renewable energy sector, boasts the largest and most diversified portfolio of projects in Greece, totaling 2,500 MW in operation, under construction, and ready for development. The company’s commitment to sustainability is evident in its current 1,224 MW installed capacity, with plans to reach 6 GW by 2029.

In 2023, Terna Energy secured permits for exploration and survey work for two pilot offshore wind projects in the Thracian Sea, indicating the company’s long-term vision for offshore wind development in Greece.

The joint venture between Terna Energy and Motor Oil has selected a site south of Alexandroupolis for the first offshore wind farm. This location, situated in northeast Greece near the Turkish border and the entrance to the Sea of Marmara, is primed for the development of a 400 MW wind farm, set to be operational by the end of 2030.

Government Support and Strategic Planning

The Greek government’s strategic plan, released in October 2024 by the Hellenic Hydrocarbons and Energy Resources Management Company, outlines 25 designated areas spanning over 2,700 square kilometers for offshore wind development. These areas have the potential to generate at least 12.4 GW of energy, with the first 10 sites targeted for development between 2030 and 2032. The government anticipates that most of these sites will utilize floating technology, becoming operational between 2025 and 2032.

See also  Suspension Lifted at Vineyard Wind with New Plan Calling for Blade Removal

Greece’s renewable energy goals include reaching 2 GW of offshore capacity, representing a significant expansion from its current onshore capacity. With 898 MW of onshore capacity added in the past four years, Greece is poised to accelerate its renewable energy development, with the Hellenic Wind Energy Association forecasting increased momentum in 2025 as projects progress into the construction phase.

Announced Farm Greeces Offshore plan Wind
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Lithuania to relaunch 700MW offshore wind tender next week

June 8, 2025

Noble bags drillship work in Papua New Guinea with TotalEnergies

June 8, 2025

Dutch firm orders MPV for subsea and renewables work

June 7, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Top 10 Biggest RORO Ships In The World

February 15, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

CMA CGM settles US sexual harassment case

January 11, 2025
Don't Miss
Offshore

EDP Renewables delays US offshore wind project until 2029 over Trump policies

March 1, 2025

The US Offshore Wind Sector Faces Setback as EDP Renewables Postpones Southcoast Wind Project The…

Hull for Japan-bound hybrid cable lay & construction vessel coming together in Romania (Video)

March 12, 2025

Borr Drilling’s rig turns up in Brazil for oil & gas decom work with Petrobras (Gallery)

April 16, 2025

Are maritime hackers pushing at an open door?

April 23, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Tar balls wash up on Canadian shoreline near grounded MSC boxship

April 21, 2025

Finish ETA 14-16 January, Ruyant loses headsail, icebergs sighted

January 3, 2025

Brazil’s President Authorizes Offshore Wind Development

January 13, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.