Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • ADES’ Jack-Up Barge Capsizes off Egypt Killing Four, Three Still Missing
  • Teledyne Maretron acquisition strengthens Raymarine portfolio
  • Offshore Power Agreements Delayed Citing Uncertainties in US Policy
  • TGS gets offshore wind site characterization job in Norway
  • HD Hyundai affiliates partner to advance autonomous shipping
  • Shelf Drilling finds work for one 1982-built rig, eyes sale of another
  • S-100 has Value Beyond ECDIS
  • HMM Plans Expansion of Algeciras Terminal as Transshipment Hub
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Maritime»Russia Celebrates Completion Of Its 4th Nuclear-Powered Icebreaker
Maritime

Russia Celebrates Completion Of Its 4th Nuclear-Powered Icebreaker

January 3, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email


Russia has celebrated the completion of its fourth nuclear-powered icebreaker, Yakutia, with a ceremony at the Baltic Shipyard in St. Petersburg.

With this achievement, Russia plans to ensure year-round shipping on the Northern Sea Route (NSR) and improve accessibility in the Arctic region.

The new vessel is part of Rosatom’s strategy to handle the growing traffic in the Arctic and keep the NSR open all year round.

Yakutia is the fourth ship in the Project 22220 series and the third of its type, designed to make Arctic shipping more efficient and reliable.

The Yakutia icebreaker is one of the largest nuclear-powered icebreakers in the world. It is 173 meters long and weighs 33,540 tons.

The ship can break through ice up to 3 meters thick and can reach speeds of up to 22 knots in open water. It is powered by two RITM-200 nuclear reactors, each with a thermal capacity of 175 MW.

These reactors are designed to work for 40 years, reducing the downtime for refuelling. This allows the Yakutia to operate in the Arctic for extended periods without interruptions.

Rosatom also predicts that by 2024, the total cargo transported along the NSR will reach a record 38 million tons. By 2030, Rosatom expects to have 17 vessels operating on the route, further enhancing Russia’s Arctic shipping capabilities.

Construction of the Yakutia began in May 2020 with the laying of its keel at the Baltic Shipyard, and it was launched in November 2022.

The ship began sea trials in the Gulf of Finland in December 2024. The sister ship, Chukotka, is still under construction, and two more icebreakers are planned for delivery by 2028 and 2030.

See also  CEO Seeking To Build Philadelphia LNG Terminal Meets

Due to disruptions in global supply chains, the ship’s components were sourced from Russian manufacturers, as the country replaced foreign-made parts with domestic alternatives.

During the flag-raising ceremony, a message from Russian President Vladimir Putin was read, recognising the successful completion of the Yakutia.

He praised the work of the Baltic Shipyard and Russian companies involved in creating the vessel.

Putin expressed confidence that Yakutia would improve Russia’s nuclear-powered fleet and help the country maintain its position as a maritime power, especially in the Arctic.

References: Tass, Baird Maritime

4th celebrates completion Icebreaker NuclearPowered Russia
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Teledyne Maretron acquisition strengthens Raymarine portfolio

July 3, 2025

Two Alpha Gas Carriers to Get Enhanced Operational Support with Wärtsilä Lifecycle Agreement

July 2, 2025

WE Tech Solutions Announces New Office In China

July 2, 2025
Top Posts

Car Carrier ‘Morning Midas’ Catches Fire with Electric Vehicles Off Alaska

June 5, 2025

China Fights Australia’s Plans to Reclaim Darwin Port Citing U.S. Influence

May 27, 2025

Denmark awards first-ever offshore wind farm life extension permit

June 4, 2025

Fire-Stricken Wan Hai 503 Continues to Drift Off Indian Coast as Salvage Efforts Intensify

June 11, 2025
Don't Miss
Offshore

Tidewater scores PSV work with Spirit Energy

May 16, 2025

Vard Tidewater Secures Charter Deal for Troms Lyra Vessel Offshore support vessel owner Tidewater has…

Microplastics Becoming Measurable Part of Ocean’s Carbon Cycle

May 5, 2025

MOL and partners get green light for large ammonia-powered ammonia carrier design

March 16, 2025

ZeroNorth, Veracity by DNV launch emissions reporting and verification service for shipping industry

May 17, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

ST Engineering bags walk-to-work vessel order

January 13, 2025

UK Government Commits £300 Million to Boost Offshore Wind Supply Chain

April 24, 2025

Baker Hughes Launches All-Electric Subsea Production System

February 9, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.