Close Menu
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Technology
  • Incidents
  • Environment
  • Events
    • Maritime
    • Offshore
    • Oil & Gas
    • Energy
  • Advertising
  • Contact
Facebook X (Twitter) Instagram LinkedIn
Trending
  • bound4blue WAPS calculation method wins DNV nod of approval
  • NOAA: Operational Forecast System Informs Shipwreck Oil Spill Scenarios
  • Tourist boat carrying 89 passengers capsizes in Bali
  • Lithuania to relaunch 700MW offshore wind tender next week
  • UML ready to welcome first newbuild tanker fitted with WAPS
  • Mother Ship with USV Flotilla Could Boost Coast Guard Capabilities
  • New Zealand To Ban Substandard Ships From Entering Its Ports
  • Noble bags drillship work in Papua New Guinea with TotalEnergies
Facebook X (Twitter) Instagram LinkedIn
Maritime247.comMaritime247.com
  • Home
  • Maritime
  • Offshore
  • Port
  • Oil & Gas
  • Energy
  • Tech
  • Incidents
  • Environment
  • Events
    • Maritime
    • Oil & Gas
    • Offshore
    • Energy
  • Advertising
Maritime247.comMaritime247.com
Home»Oil & Gas»370-meter-long FPSO ends two-month journey from Singapore at Brazilian field
Oil & Gas

370-meter-long FPSO ends two-month journey from Singapore at Brazilian field

February 25, 2025
Facebook Twitter LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Email

A New Era in Offshore Operations: Bacalhau FPSO Arrives in Santos Basin

A 370-meter-long floating storage, production, and offloading (FPSO) unit constructed by Japanese giant MODEC has arrived at its final destination in the Santos Basin offshore Brazil where it will operate at Equinor’s field.

The Bacalhau FPSO arrived at its destination in the Santos Basin on Friday, February 21, following a year and a half of integration and commissioning in Singapore and a journey of around two months to Brazilian waters.

The project teams are now beginning the process of anchoring, carried out with the assistance of four tugboats, after which the installation scope will resume, including the recovery of the umbilicals and risers already installed on the seabed to connect to the FPSO and continue the vessel’s commissioning scope.

During the commissioning campaign, a support, maintenance, and safety vessel will be connected to the FPSO.

“With the arrival of the FPSO Bacalhau, we will focus on the next activities of the project. We will have anchoring, connection of the umbilicals and risers to the FPSO, pre-commissioning and commissioning of the entire system, including the wells already drilled. Our teams are focused on ensuring a safe start of operations,” said Trond Bokn, Senior Vice President of Project Development at Equinor.


Source: Equinor

The FPSO, described as the largest vessel of its kind to be delivered to Brazil with its 370 meters in length and 64 meters in width, has the capacity to produce 220,000 barrels per day and uses a new hull design developed by MODEC.

The naming ceremony for the Bacalhau FPSO took place on October 21, 2024, at Seatrium’s Tuas Boulevard Yard. The Singaporean firm was in charge of undertaking integration work on the FPSO after Aibel wrapped up the work on topside modules.

See also  Techano Oceanlift to Deliver Crane for Dual-Fuel Hybrid CSV Newbuild

The vessel boasts the title of the world’s first FPSO with DNV’s Abate notation, received in July 2024.

It is estimated that during the entire life cycle of the Bacalhau project, it will generate around 50,000 direct and indirect jobs. When added to Raia, another project operated by Equinor in the Campos Basin, the number of direct and indirect jobs reaches 100,000.

Bacalhau is operated by Equinor (40%) in partnership with ExxonMobil (40%), Petrogal Brasil – a joint venture of Galp and Sinopec (20%), and the government company Pré-Sal Petróleo SA (PPSA), which is the manager of the sharing contract.

The field is located 185 kilometers off the coast of the municipality of Ilhabela, in the state of São Paulo, in a water depth above 2,000 meters.

The discovery was made by Petrobras in 2012, while Equinor has been the operator since 2016. Bacalhau will be the first greenfield development in the pre-salt by an international operator.

First oil is expected in 2025, with Phase 1 reserves exceeding 1 billion barrels and having a production capacity of 220,000 boe/d.

“Bacalhau is a very important project in Equinor’s portfolio. With over 1 billion estimated recoverable reserves, seeing the FPSO arrive at the Field is a very relevant milestone. This project is proof of what we can achieve when we combine our expertise and work with our partners and suppliers towards a common goal,” said Veronica Coelho, President of Equinor in Brazil.

370meterlong Brazilian Ends Field FPSO Journey Singapore twomonth
Share. Facebook Twitter LinkedIn Tumblr Telegram Email

Related Posts

Partner selection quest for Alaska LNG tops $115B in interest from 50 firms

June 7, 2025

Transocean rig lines up more offshore drilling work in Norwegian waters

June 7, 2025

Modec and Carbon Clean team up on FPSO carbon capture

June 7, 2025
Top Posts

Duties of Bosun (Boatswain) on a Ship

February 1, 2025

Top 10 Biggest RORO Ships In The World

February 15, 2025

Sea-Doo Switch recall underway after serious safety concerns

March 2, 2025

CMA CGM settles US sexual harassment case

January 11, 2025
Don't Miss
Oil & Gas

TMC to fit 12 LNG carriers and 1 FPSO with its compressors

April 30, 2025

Norway’s TMC Compressors Secures Contracts for Marine Compressed Air Systems Norway-based TMC Compressors has been…

Hydrosurv REAV-28 tapped for new projects in Eastern Med

December 30, 2024

How Real-Time Emissions Monitoring Prepares Shipowners for EU ETS Deadline

April 15, 2025

Dutch-Norwegian floating solar specialist receives ISO 9001 certification

May 5, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

About Us
About Us

Stay informed with the latest in maritime, offshore, oil & gas, and energy industries. Explore news, trends, and insights shaping the global energy landscape.

For advertising inquiries, contact us at
info@maritime247.com.

Facebook X (Twitter) YouTube LinkedIn
Our Picks

Italian Sea Group reports 2024 financial results

April 6, 2025

latest stats reveal a challenging year for the boating industry in Finland

February 8, 2025

Ben Ainslie astounded after INEOS Britannia firing

January 24, 2025

Subscribe to Updates

Your Weekly Dive into Maritime & Energy News.

© 2025 maritime247.com - All rights reserved.
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Advertising

Type above and press Enter to search. Press Esc to cancel.